1 / 16

Claudia M. Bilotto, AICP March 26, 2009

Visualization Tools and Techniques for Transportation Projects Presented to: Georgia Planning Association Spring Conference. Claudia M. Bilotto, AICP March 26, 2009. Why Visualize?. Common language across backgrounds and perspectives. Provides context around complex ideas and concepts.

eljah
Download Presentation

Claudia M. Bilotto, AICP March 26, 2009

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Visualization Tools and Techniques for Transportation ProjectsPresented to:Georgia Planning Association Spring Conference Claudia M. Bilotto, AICP March 26, 2009

  2. Why Visualize? • Common language across backgrounds and perspectives. • Provides context around complex ideas and concepts. • Helps to inform decisions and generate buy-in. • Less confusion = less resistance and time.

  3. Visualization and SAFETEA - LU • MPOs and States “shall employ” visualization techniques to describe the Regional Transportation Plan (RTP) and Statewide Transportation Plan • Techniques include: GIS, Traffic Simulation, Visual Preference Surveys, Videos, Renderings, Overlays

  4. High - Tech Visualization Tools • Scenario Planning Programs • 3D Animation • Simulation Videos • Multi-Media Gaming • Google Earth • Others?

  5. What do I need for a “High – Tech” visualization? • Data • Resources • Technology • Expertise

  6. Visualization and Web 2.0 • Integrate with existing online resources. • Expand your reach. • Create opportunities for comment. • Maximize your resources.

  7. Examples • I-85 and GA 400, Atlanta, GA • Windy Hill Road Extension, Cobb County, GA • IH-30 Managed Lanes, Dallas, TX • Missouri Statewide Transportation Plan, MO • I-70 SEIS www.improvei70.org/ , MO • Missouri River Pedestrian Bridge, Omaha, NE

  8. I-85 at GA 400 Interchange, Atlanta, GA The Project: New ramp connection between two of Atlanta’s most frequently traveled highways. The Challenge: Demonstrate the impact and engineering feasibility of a flyover connection in tight right-of-way with a minimal public outreach program. The Result: Buy-in from the client, the engineering community, and the public at-large.

  9. Windy Hill Road Extension, Cobb County, GA The Project: New location roadway extending Windy Hill Road from Austell Road to Macland Road. The Challenge: Design and build consensus on a feasible alternative while working with citizens directly impacted by the project. The Result: Consensus alternative developed with support from the community.

  10. Missouri Statewide Transportation Plan The Project: Statewide Transportation Plan for the State of Missouri The Challenge: Communicate the funding challenges faced by transportation decision makers. The Result: Public education, input, and interest in the Statewide plan development process.

  11. IH-30 Managed Lanes, Dallas, TX The Project: Managed lanes in the Dallas, TX Region The Challenge: Demonstrate proposed declaration gantries for managed lanes access and operations The Result: Public education and understanding of facility operation without misconceptions.

  12. I-70 Supplemental EIS, Missouri The Project: Supplemental Environmental Impact Statement for potential truck only lanes along the most important transportation corridor in Missouri. The Challenge: Engage citizens from across the state and communicate the purpose, function, and operation of truck only lanes. The Result: Nearly 600 downloads and 400 comments generated – far more than traditional public outreach programs.

  13. Missouri River Pedestrian Bridge, Omaha, NE The Project: Pedestrian bridge connecting Omaha Riverfront and Council Bluffs, Iowa. The Challenge: Communicate a vision, highlight design features, and receive conceptual approval prior to detailed engineering. The Result: Buy-in from local citizen groups, businesses, and elected officials on the centerpiece of a billion dollar revitalization effort.

  14. Lessons Learned • High-tech visualization is a tool for understanding concepts but is more than “eye candy”. • Portability / accessibility can maximize investment in high-tech visualization – practicality is key. • Interactive visualization tools promote inclusiveness and consensus.

  15. For more information • FHWA Visualization in Planning Website: http://www.fhwa.dot.gov/planning/vip/index.htm • TRB Committee on Visualization in Transportation http://www.trbvis.org/

  16. Questions and Answers Thank you! Claudia M. Bilotto, AICP HNTB Corporation cbilotto@hntb.com 404.946.5747

More Related