Construction Technology 3 D39 TA

Construction Technology 3 D39 TA. Lecture 3: Types of offsite production. Dr Mohamed Abdel-Wahab Edwin Chadwick Building, Room 1.16 m.abdel-wahab@hw.ac.uk www.mohamedabdel-wahab.co.uk. What are the drivers for offsite production?. Lecture Outline. Volumetric

elke
Download Presentation

Construction Technology 3 D39 TA

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Construction Technology 3 D39 TA Lecture 3: Types of offsite production Dr Mohamed Abdel-Wahab Edwin Chadwick Building, Room 1.16 m.abdel-wahab@hw.ac.uk www.mohamedabdel-wahab.co.uk

  2. What are the drivers for offsite production?

  3. Lecture Outline Volumetric Panellised construction systems Hybrid construction Sub-assemblies and components

  4. Volumetric

  5. Can you think of a type of project where it would be crucial to use volumetric construction?

  6. Would you live here?!

  7. How long did it take to construct Container City 1 and how long it would have taken if constructed the traditional way? Container City 1

  8. What could be the practical considerations for volumetric construction?

  9. Volumetric construction: bathroom and kitchen pods Bathroom in a box

  10. Practical considerations for volumetric construction (Pods)

  11. Summary of Pod cost data

  12. Panellised construction systems

  13. Types of panels Open panels Closed panels Concrete panels

  14. Composite panels SIPS

  15. Oriented Strand Board (OSB)

  16. Can you identify the 11-step process for the manufacturing of OSBs?

  17. Advantages of using SIPs • Pre-assembled from the factory • Three times stronger than conventional stud walls • Allowing for design flexibility • Protection of the insulation material • Using recycled wood chips instead of newly-cut lumber

  18. Unitised curtain walling

  19. Practical considerations for panellised construction system

  20. Hybrid construction

  21. Practical considerations for hybrid construction

  22. Sub-assemblies and components Pre-fabricated foundations (e.g. ground beams) Floor cassettes

  23. Pre-cast stairs Roof cassettes Pre-assembled roof structure

  24. Practical considerations for sub-assembly

  25. Summary Volumetric Panellised construction systems Hybrid construction Sub-assemblies and components

  26. Suggested resources Steel framing walls assembly video

  27. Go to m.socrative.com G02 G02