1 / 5

River Corridor Closure Project

River Corridor Closure Project. Safety • Teamwork • Disciplined Operations • Integrity. Columbia River Component – Data Gap Analysis Workshop. Date June 5 – 6, 2007. Introduction. Follow up to discussions held March 21, 2007 Agenda Overview Logistics Introductions

ella
Download Presentation

River Corridor Closure Project

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. River Corridor Closure Project Safety • Teamwork • Disciplined Operations • Integrity Columbia River Component – Data Gap Analysis Workshop Date June 5 – 6, 2007

  2. Introduction • Follow up to discussions held March 21, 2007 • Agenda Overview • Logistics • Introductions • Workshop Goals – Jill Thomson, WCH • DOE Perspective – John Sands, DOE-RL

  3. Workshop Goals • Present the results of an extensive review of existing data • Identify rationale for determining a downstream boundary for the study • Propose data gaps • Discuss a path forward for the Columbia River Component

  4. DOE Perspective • Data Compilation (WCH-64) issued in January 2006 after completion of 10 workshops occurring from December 2004 to September 2005 • Data Evaluation and Summary (WCH-91) issued in July 2006 • Overview of Evaluation results presented at several different meetings last year, including the NRTC and HAB • February 20, 2007 - RL, EPA, and Ecology discussed path forward and agreed to perform a data gap analysis

  5. Next Steps • The Data Gap Analysis report will be used to initiate a DQO Process to focus what additional sampling will be required to support a screening level risk assessment. • This will be followed by preparation of a SAP and subsequent sampling. • At this time contractual arrangements for this work need to be finalized.

More Related