1 / 5

Plan for 2009 activity

Plan for 2009 activity. S. Uozumi and All Dec-14 2009 ScECAL meeting @ KEK. Beam Test. DESY BT analysis (Satoru) KEK BT analysis (Nishiyama) FNAL BT analysis Nishiyama, Sakuma, Adil FNAL BT data taking everyone. MPPC related. Improve performance with Hamamatsu

ellema
Download Presentation

Plan for 2009 activity

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Plan for 2009 activity S. Uozumi and All Dec-14 2009 ScECAL meeting @ KEK

  2. Beam Test • DESY BT analysis (Satoru) • KEK BT analysis (Nishiyama) • FNAL BT analysis • Nishiyama, Sakuma, Adil • FNAL BT data taking • everyone

  3. MPPC related • Improve performance with Hamamatsu • Dynamic range (20um pitch or smaller) • Various prioerties • 1.3^2mm2 or rectangular • package • Long-term stability (Takahashi) • Response curve study • Radiation tolerance • Estimation of radiation dose to MPPC at ILC • Radiation test • Magnetic tolerance • Robustness (broken MPPC)

  4. Scintillator • Establish scintillator production with KNU • Mechanical stability • Injection mould ? • Megastrip structure • 5 mm wide strip • Bench test • Reflector, method etc. • Optical simulation • Estimate optimal light yield

  5. Simulation • Strip clustering (Kotera) • MIP calibration (Yanagida, Shinshu)

More Related