Meeting Agenda (讨论议程) 9-04-13 • Overview (概观) • Knowledge Matrix (智能矩阵) • Ongoing tasks (进行中任务) • Approaching Dates (日期) • Timeline (时间安排)
(1) Overview (概观) • Before 9-4, GT drafts a detailed, 6month work plan. Status: Done. Discussed during last meeting. . (9-4之前,GT起草一份详细的第一周期工作计划。状态:已完成。已讨论) • Before 9-4, GT drafts the intelligent matrix entries, then discusses with SEAS. Status: Done. To be discussed today progress(9-4之前,GT起草智慧矩阵条目 , 然后与SEAS讨论。状态:已完成。今天要讨论) • Before 9-11, SEAS drafts the contents of interviews and communicates with GT.(9-11之前,SEAS起草访谈内容並与GT讨论) • Before 9-18, GT drafts the framework of the ILM, and communicate with SEAS.Status: In progress (9-18之前,GT起草智能学习发动机架構,並与SEAS讨论。状态: 进行中)
(2) Knowledge Matrix (智能矩阵) • Operation Scenarios (Given) 操作场景 (给予) • Operation Parameters (Decisions made by engineers) 操作参数 (工程师作决定) • Performance (output values to be optimized)性能输出(优化的输出值) • See Knowledge Matrix doc 详见智能矩阵文档
(3) Ongoing Tasks (进行中任务) • Literature review (GT) 文献检阅 • Compile a list of feasible modeling methods and algorithms 编译可行的建模方法和算法 • Build ILE structure (GT, To be discussed next time) 建立ILE结构 (GT,下次要讨论的) • Interview data collection (SEAS) 访谈资料收集 • Interview of floor engineers (SEAS) 专访工程师
(4) Approaching Dates (日期) • 9-04-2013: Work Plan and Knowledge index draft. Completed by GT 工作计划和智能矩阵索引草案 • 9-11-2013: Selection of ILE modeling methods and algorithms. GT 选择ILE建模方法和算法 • 9-11-2013: Interview Question draft. SEAS访谈问题草案 • 9-13-2013: Perform Interview. SEAS 进行专访