An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Meeting Agenda (讨论议程) 9-04-13 • Overview (概观) • Knowledge Matrix (智能矩阵) • Ongoing tasks (进行中任务) • Approaching Dates (日期) • Timeline (时间安排)

  2. (1) Overview (概观) • Before 9-4, GT drafts a detailed, 6month work plan. Status: Done. Discussed during last meeting. . (9-4之前,GT起草一份详细的第一周期工作计划。状态:已完成。已讨论) • Before 9-4, GT drafts the intelligent matrix entries, then discusses with SEAS. Status: Done. To be discussed today progress(9-4之前,GT起草智慧矩阵条目 , 然后与SEAS讨论。状态:已完成。今天要讨论) • Before 9-11, SEAS drafts the contents of interviews and communicates with GT.(9-11之前,SEAS起草访谈内容並与GT讨论) • Before 9-18, GT drafts the framework of the ILM, and communicate with SEAS.Status: In progress (9-18之前,GT起草智能学习发动机架構,並与SEAS讨论。状态: 进行中)

  3. (2) Knowledge Matrix (智能矩阵) • Operation Scenarios (Given) 操作场景 (给予) • Operation Parameters (Decisions made by engineers) 操作参数 (工程师作决定) • Performance (output values to be optimized)性能输出(优化的输出值) • See Knowledge Matrix doc 详见智能矩阵文档

  4. (3) Ongoing Tasks (进行中任务) • Literature review (GT) 文献检阅 • Compile a list of feasible modeling methods and algorithms 编译可行的建模方法和算法 • Build ILE structure (GT, To be discussed next time) 建立ILE结构 (GT,下次要讨论的) • Interview data collection (SEAS) 访谈资料收集 • Interview of floor engineers (SEAS) 专访工程师

  5. (4) Approaching Dates (日期) • 9-04-2013: Work Plan and Knowledge index draft. Completed by GT 工作计划和智能矩阵索引草案 • 9-11-2013: Selection of ILE modeling methods and algorithms. GT 选择ILE建模方法和算法 • 9-11-2013: Interview Question draft. SEAS访谈问题草案 • 9-13-2013: Perform Interview. SEAS 进行专访