1 / 9

Storage Cell Tests at ANKE (R. Engels, B. Lorentz, F. Rathmann, H. Seyfarth …)

Storage Cell Tests at ANKE (R. Engels, B. Lorentz, F. Rathmann, H. Seyfarth …). ANKE with PIT New Targetchamber installed! Tests using an Aperture Preparation for tests with cells. Goal: ANKE Spectrometer with a polarized internal storage cell target. New Targetchamber. Needed for:

elpida
Download Presentation

Storage Cell Tests at ANKE (R. Engels, B. Lorentz, F. Rathmann, H. Seyfarth …)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Storage Cell Tests at ANKE(R. Engels, B. Lorentz, F. Rathmann, H. Seyfarth …) • ANKE with PIT • New Targetchamber installed! • Tests using an Aperture • Preparation for tests with cells

  2. Goal: ANKE Spectrometer with a polarized internal storage cell target

  3. New Targetchamber Needed for: • Accomodation of the storage cell of the PIT • Flexible use with • Cluster Target • Pellet Target • Space for Installation of a vertex/spectator detector • BPM system up/downstream of cell (x vs y) • Differential pumping • Still Missing: • ABS Bridge • LSP Support • Supports for setup in Bermuda 

  4. Chamber prior to installation(Winter shutdown 2002/2003) ZAT! Beam

  5. After Installation

  6. ANKE BPM (upstream) • Movable, acceptance limit. of backward detector beam

  7. Aperture Tests • Aperture mounted on horizontal strip target support • Beam Steering capabilities improved around ANKE (SH30SV30) • With a vertical four-steerer bump (SV24+SV26) and (SV28 SV30), orbit bump at ANKE small! Without aperture: 21010 With Aperture: 9.4109 2.44 GeV/c March 2002

  8. Equipment for Cell tests Two xy Tables Window frame (25 mm  50 mm) beam

  9. Planned Measurements • Install equipment (xy tables + frame) after long summer run • Goal: Find cell dimensions • Tests with Cluster Target no target dt=1.41014 cm-2 dt=41014 cm-2 M.A. Ross et al. NIM A 326, 424 (1993)

More Related