Infrastructure – Condition Assessment. Overview & Purpose Infrastructure Condition Assessment – General Findings/Conditions Streets/Sidewalks/Parking Lots Storm Drainage System Water System Sanitary Sewer System Capital Improvement Program Development Analysis of Data Modeling
E N D
Infrastructure – Condition Assessment Overview & Purpose • Infrastructure Condition Assessment – General Findings/Conditions • Streets/Sidewalks/Parking Lots • Storm Drainage System • Water System • Sanitary Sewer System • Capital Improvement Program Development • Analysis of Data • Modeling • Cost Opinion • Memoranda of Agreement
Infrastructure – Condition Assessment Streets and Bridges – 90% Complete • Assessment of curb/gutter, sidewalk, parking lots, signs & markings • VDOT reviewing the street inventory to make a judgment on funding eligibility • Roadware Study Review • 2008 Bridge Inspection Report Review
Infrastructure – Condition Assessment Stormwater – 100% Complete • Limits of condition assessments • 40 structures assessed • All outfalls assessed • Pipe material identification • Evaluation of 2005 Report • System Mapping
Infrastructure – Condition Assessment Wastewater – 75% Complete • Gravity system condition assessments • Manhole Checks and Entry Assessments • Review of Past Studies • Evaluation of existing system condition information from ODUS • Remaining Work • CCTV Gravity and Pressure Systems – Start 12/1/09 • Flow Monitoring – Start 1/1/10 • System Mapping/Modeling • Pump Station Evaluations
Infrastructure – Condition Assessment Water – 80% Complete • Evaluation of existing system condition information from ODUS • System Mapping/Modeling • Material Assessments by NNWW
Infrastructure – Condition Assessment Hampton, Newport News, and Other Coordination • Met with Hampton, NNWW, ODUS, and DPW in September • Met with DEQ and HRSD in October • Fort Monroe will not be required to participate in the Regional DEQ Consent Order • Information Sharing • Accompany Field Crews doing Condition Assessment
Infrastructure – Condition Assessment What’s Next? • Complete Field Investigations by 12/31/09 • Flow Monitoring Sewer 1/1/10 • Develop Water & Sewer System Models • Data Analysis and Final Assessment Report • Capital Improvement Program/Cost Opinions • Memorandums of Agreement