1 / 8

Infrastructure – Condition Assessment

Infrastructure – Condition Assessment. Overview & Purpose Infrastructure Condition Assessment – General Findings/Conditions Streets/Sidewalks/Parking Lots Storm Drainage System Water System Sanitary Sewer System Capital Improvement Program Development Analysis of Data Modeling

elsu
Download Presentation

Infrastructure – Condition Assessment

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Infrastructure – Condition Assessment Overview & Purpose • Infrastructure Condition Assessment – General Findings/Conditions • Streets/Sidewalks/Parking Lots • Storm Drainage System • Water System • Sanitary Sewer System • Capital Improvement Program Development • Analysis of Data • Modeling • Cost Opinion • Memoranda of Agreement

  2. Infrastructure – Condition Assessment Streets and Bridges – 90% Complete • Assessment of curb/gutter, sidewalk, parking lots, signs & markings • VDOT reviewing the street inventory to make a judgment on funding eligibility • Roadware Study Review • 2008 Bridge Inspection Report Review

  3. Infrastructure – Condition Assessment Stormwater – 100% Complete • Limits of condition assessments • 40 structures assessed • All outfalls assessed • Pipe material identification • Evaluation of 2005 Report • System Mapping

  4. Infrastructure – Condition Assessment Wastewater – 75% Complete • Gravity system condition assessments • Manhole Checks and Entry Assessments • Review of Past Studies • Evaluation of existing system condition information from ODUS • Remaining Work • CCTV Gravity and Pressure Systems – Start 12/1/09 • Flow Monitoring – Start 1/1/10 • System Mapping/Modeling • Pump Station Evaluations

  5. Infrastructure – Condition Assessment Water – 80% Complete • Evaluation of existing system condition information from ODUS • System Mapping/Modeling • Material Assessments by NNWW

  6. Infrastructure – Condition Assessment Hampton, Newport News, and Other Coordination • Met with Hampton, NNWW, ODUS, and DPW in September • Met with DEQ and HRSD in October • Fort Monroe will not be required to participate in the Regional DEQ Consent Order • Information Sharing • Accompany Field Crews doing Condition Assessment

  7. Infrastructure – Condition Assessment What’s Next? • Complete Field Investigations by 12/31/09 • Flow Monitoring Sewer 1/1/10 • Develop Water & Sewer System Models • Data Analysis and Final Assessment Report • Capital Improvement Program/Cost Opinions • Memorandums of Agreement

  8. Questions?

More Related