ELECTRICAL INTERFACES

ELECTRICAL INTERFACES. Martin Frericks, Frans Zwart. Power. Primary power (specification by IKI coming) single power bus? nominal, minimum and maximum voltage? transients, r ipple and spikes? bus impedance? current limiting? dc/dc converter frequency range and mode? Power budget

elvis
Download Presentation

ELECTRICAL INTERFACES

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ELECTRICAL INTERFACES Martin Frericks, Frans Zwart

  2. Power • Primary power (specification by IKI coming) • single power bus? • nominal, minimum and maximum voltage? • transients, ripple and spikes? • bus impedance? • current limiting? • dc/dc converter frequency range and mode? • Power budget • Power profiles of all SXC units • BOL, EOL • peak load including inrush currents, load variations • power switching modes … 

  3. Power switching modes • Parts of the instrument that can be switched ON/OFF by the S/C …  • Parts of the instrument that can be switched ON/OFF by e.g. TC or automatic power up / power down sequences • Definition of operational / idle / non-operational / survival modes? • Switch-off during radiation belt passage: • CAP & CDP?

  4. Power switching at S/C side • Parts of the instrument that can be switched ON/OFF by S/C: • P1: CDE2 • P2: Calorimeter PSU • P3: CDE1 • P4: TAC • P5: IDC • Pyro’s • interface requirements between pyro power supply (IKI) and: • telescope door (SRON) • cryostat door (ISAS) • three cryostat valve (ISAS)

  5. ElectroMagnetic Compatibility (EMC) • No EMC test foreseen on instrument level, only on sub-system level (i.e. • EMC requirements: • from S/C (including other instruments): IKI • from/to detector assembly: ISAS and/or GSFC between cooling and detector: ISAS and GSFC • from/to TAC: SRON • EMC testplan & results available from Suzaku (heritage) • Grounding & shielding concept: • based on Suzaku • where central grounding? • EMC aspects: • susceptibility, emission • radiated (E/H), conducted (DM/CM; power/signal lines)

  6. ElectroStatic Discharge (ESD) • ESD requirements (IKI) • ESD test to be performed? On which models?

  7. Radiation - EEE part qualification • Radiation 10 kRad (TBC, based on 5 year lifetime?) Power switching options during radiation belt passage • CAP & CDP? • Component quality level

  8. SpaceWire, I/F to S/C ???

  9. Harness • Requirements: • shielding • grounding • combination of signals and power • connector types and quality • heat conductance: only issue within cryostat, not between units