1 / 26

Site Personnel Structure : NAVAIR Rep / Logistics : - MGySgt Evergin Marine Liaison (CSC)

FLEET READINESS CENTER SOUTHWEST Mobile Facilities Configuration & Engineering Site MGySgt Michael Evergin Jim Sorrells / Bill Allen Naval Air Station North Island, Coronado San Diego, CA 92135 (619) 545-2312 2010 LRG. Site Personnel Structure : NAVAIR Rep / Logistics :

ely
Download Presentation

Site Personnel Structure : NAVAIR Rep / Logistics : - MGySgt Evergin Marine Liaison (CSC)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. FLEET READINESS CENTER SOUTHWESTMobile Facilities Configuration & Engineering SiteMGySgt Michael Evergin Jim Sorrells / Bill AllenNaval Air Station North Island, CoronadoSan Diego, CA 92135(619) 545-23122010 LRG

  2. Site Personnel Structure: • NAVAIR Rep / Logistics: • - MGySgt Evergin Marine Liaison (CSC) • GySgt Moore Assistant Liaison (CSC) • Robert Fields ATAERO Logistics Analyst • Production: • Jim Sorrells Production Manager • David Jackson Site Supervisor • Phil Centman Estimator/Financials • Chris Schlichtholz Purchaser/DLA Rep

  3. Site Personnel Structure:Engineering: - Bill Allen Engineering Lead - Mark Beuster Mechanical Engineer - Pete Vicencio Electrical Engineer - Lloyd Bjurman Electrical Engineer

  4. MOFAC Hazard Abatement/MF Upgrade Team • VD-05 / VD-07 AECTS 480v Connectors • FA-03 STS Upgrade (Karine Mouridian / Bob Pizzella) • FS-01 Hazmat/Flammable Storage Explosion Proof Circuit Breakers • KA-18A Rail/Trolley/Hoist Installation

  5. AECTS Layout

  6. AECTS Electrical Power Connection

  7. Solution • Replace all 120/208vac connectors on the secondary side of the transformer end connectors on the two output cables, and the two power input connectors on the VD-05 and VD-07 with 480vac connectors.

  8. FA-03 STS Upgrade • MALS-11 Complete • MALS-12 Complete • MALS-41 Scheduled for 21June 2010 • Coming to a theater near you soon….

  9. FA-03B

  10. FA-03B

  11. FS-01 Explosion Proof Abatement

  12. RT/CASS

  13. RT/CASS

  14. KA-31 OTPS Support MF

  15. KA-31 OTPS Support MF

  16. SEC 5824:R-134A 3 TON 30A to 40A ECU Conversion • Two Kits available through the CKA • Kit A1: For single R-134A ECU Conversion • Kit A2: For MFs with two R-134A ECUs

  17. CR-04 2M MF • MF A to MF B: Shell conversion • Work Station: Narrowed for more internal MF space, accommodates standard ESD Mat • Lamp: Over 100 Ft Candles, Swivels into multiple positions • ESD/Ergonomic Chairs: Lowered to accommodate taller Marines • Fume Extractor: 100 CF Per Minute x 2, 3 outlets

  18. Industrial Hygiene • 2M is a NAVSEA Program: • Testing on potentially hazardous residues was conducted in 1994/95 with no harmful levels detected • NAVEVNIRHLTHCEN ltr 6290Ser 33D1/003 of 3 Jan 94 • NAVAIRSYSCOM ltr 4790Ser AIR-3.6.1.3/0055 of 26 Jun 95 • Test was only conducted aboard ships • Looking at standardized testing for MFs – Currently in work

  19. RTCASS High Power

  20. KA-20B RTCHP(Bench was received in 2 sections, RT Cass side & Bridge/HP side)

More Related