1 / 4

AGS/Booster PP Setup Status

Haixin Huang. March 5 , 2013 Time Meeting. AGS/Booster PP Setup Status. The Radial Swing Removed. after. before. Faster Ramp Near the End. Status.

Download Presentation

AGS/Booster PP Setup Status

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. HaixinHuang March 5, 2013 Time Meeting AGS/Booster PP Setup Status

  2. The Radial Swing Removed after before Haixin Huang

  3. Faster Ramp Near the End Haixin Huang

  4. Status • The radial swing during extraction which caused Ggamma value dipped below 45.3 from time to time has been mitigated to less level. Tom and Freddy increased the length of the extraction setup up to reduce the amplitude of the radial swing. Polarization measurements before and after showed polarization increased from 65% to 70% (1.8*10^11). • Keith has set up a faster ramp near the end. Rocco and Yann already developed new jump quads timing for this lattice. Sev has modified the orbit control software to accommodate the shift of 36+Qy. The polarization is around  70%. We will continue to tune  this setup and hope for higher polarization. • Intensity at AGS flattop has been pushed to 2.4*10^11 with 4.2*10^11 as Booster input. • Keith has switched Booster stripping foil to the stamp foil. It give slightly better emittance at Booster extraction. Haixin Huang

More Related