Estimation of resources (personnel, material, space) needed for PACMAN
Estimation of resources (personnel, material, space) needed for PACMAN. Summary ( kCHF ). CERN, 17/06/2013, HMD, SR, AC, MM, NCL, MW, AG. Summary of M to P ressources (FTE). WP1 Metrology & Alignment. Estimation of resources (personnel, material , space ) needed for PACMAN. ESR1.1.
193 views • 11 slides