110 likes | 325 Views
SOER 2015 Update NFP / EIONET MEETING. 17 October 2013 SOER 2015 Coordination Group. SOER 2015 A suite of product(s): short briefs + up-to-date indicators. SYN. A. B. C. Synthesis & Derivatives. Thematic SOE information. Country-level SOE information.
E N D
SOER 2015 UpdateNFP / EIONET MEETING 17 October 2013SOER 2015 Coordination Group
SOER 2015A suite of product(s): short briefs + up-to-date indicators SYN A B C Synthesis & Derivatives Thematic SOE information Country-levelSOE information Global Megatrends (Europe in global context) Synthesis report country fiches & cross-country comparison fiches GMT fiches thematic fiches SOER 2015 In Print SOER 2015 Online FLISindicators EEA indicators EEA & country indicators 2012 2013 2014 3 indicator reports & stakeholder workshop Related (flanking) activities SENSE FLIS IMS SENSE CDR GMES SENSE GEMET IMS ? ? SENSE SENSE Reportnet Data Centres GCI ROD EyeonEarth ETDS SDI SERIS AoA Signals 2015 and other derivatives Discomap SOE online
SOER 2015The path from SOER 2010 to SOER 2015 Draft selection of Part B and Part C topics (incl. Eionet consultation) SOER 2015 Implementation Plan SOER 2015 Project Plan Publication of SOER 2015 Final Outline for all parts (by Dec) - Phase 1 First Draft Part B&Part C(by Mar), Part A&Synthesis(by May) - Phase 2 Quality assurance and Eionet consultation (including MB Seminar ) - Phase 3 Final Draft Part A, Part B &Part C (by Jul), Synthesis (by Sep) - Phase 4 Final (internal) quality assurance, plus SOER 2015 Online finalisation - Phase 5 Final data updates (where needed)
SOER 2015Implementation phase(s) 2013 to 2014 The implementation of the SOER 2015 Project has started ... SOER 2015 is well on track!
SOER 2015Synthesis • Focus: A synthesis across different SOER 2015 parts to provide a strategic integrated and cross-thematic assessment • Progress: Prepared two stakeholder workshops, scheduled these for 9-10 Dec & 6-7 Feb (for 30 external participants, by invitation only) • Next steps: Host stakeholder workshop 9-10 Dec; prepare draft annotated outline of Synthesis in January (i.e. not December) • Next for Eionet: Management Board seminar on 25 March 2014, Scientific Committee and National Focal Points will also be invited
SOER 2015Part A – Global Megatrends • Focus: An updated assessment of global megatrends (GMT), i.e. focussing on the same issues presented in SOER 2010 • Progress: Published two ‘GMT updates‘ (GMT 5 ‘Continued economic growth?‘, GMT 6 ‘From a unipolar to multipolar world’) • Next steps: Continue publishing ‘GMT updates‘ during coming months, develop a four-page structure for GMT fiches by January • Next for Eionet: Feedback on ‘GMT updates‘ by NRC-FLIS will be taken into account in ‘GMT fiches‘ development A
SOER 2015Part B – Thematic SOE information • Focus: A series of brief summaries of state and trend in key environmental themes, guide through EEA knowledge base • Progress: Proposed a set of 24 draft topics for thematic fiches based on four guiding criteria set out in the SOER 2015 Implementation Plan • Next steps: Develop a four-page structure for thematic fichesbased on the final selection of topics in November 2013 • Next for Eionet: Feedback on topics (until 23 Oct 2014) B
SOER 2015Part B – Thematic SOE information Note: (*) indicates that topic is also being considered as topic for cross-country comparison fiche (Part C).
SOER 2015Part C – Country level SOE information • Focus: (a) summaries of national state of environment reports (b) EEA indicator-based country comparisons for 8-10 themes • Progress: Proposed a set of 8 indicators for cross-country comparison fiches; developed a first draft guidance for country fiches • Next steps: Develop a four-page structure for cross-country comparison fiches (by November); finalise guidance document for country fiches (by December); decide on regional fiches (by December) • Next for Eionet: Feedback on template for country fiches, and feedback on indicator selection and method (until 30 Oct 2013) Cb Ca
SOER 2015SOER 2015 Online • Focus: An internet based representation of all SOER 2015components, allowing interconnectivity between parts • Progress: In-house discussion and development of a draft ‘Fiche Management System‘ to host all information on Part A, B & C • Next steps:Test of ‘Fiche Management System‘ and decide when and how to start using it in SOER 2015 (in December) • Next for Eionet: Continue Eionet input to SOE online with existing information flows; continue work towards SENSE-III SOER 2015 ONLINE
SOER 2015Summary of current Eionet involvement requested • (1) Written feedback on the topics proposed for ‘thematic fiches’ (Part B) Based on NFP Document 6; by 23 October 2013 • (2) Written feedback on the topics, indicators and approach proposed for the ‘cross-country comparison fiches’ (Part C) • Based on NFP Document 7; by 30 October 2013 • (3) Written comments on the proposed focal questions, draft template and guidance document for the ‘country fiches’ (Part C) • Based on NFP Document 7 - Annex; by 30 October 2013 • (4) Reserve 25 March 2014 for Management Board Seminar participation