The purpose of the East Midtown Greenway project was to bridge the gap between the Manhattan Waterfront Greenway and the East River and to provide easy access to the waterfront and open space resources. Rite Geosystems, our subsidiary in the USA, was entrusted with the important task of monitoring the state of the existing retaining wall in the vicinity of construction works.

encardio
Download Presentation

Case Study of East Midtown Greenway Project

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ONE STOP MONITORING SOLUTIONS | HYDROLOGY | GEOTECHNICAL | STRUCTURAL | GEODETIC Over 50 years of Excellence through ingenuity PROJECT DOSSIER EAST MIDTOWN GREENWAY PROJECT PROJECT OVERVIEW EAST MIDTOWN GREENWAY - EAST 53RD - 61ST STREET - BOROUGH OF MANHATTAN East Midtown, USA Wang Tech The Greenway Project will fill a major gap in the Manhattan Greenway along the East River while much-desired waterfront East Midtown Project Location Contractor Waterfront Duration 2020 and ongoing providing access and public open space resources. The E 53rd to E 61st St phase of the project entails construction of the northern section of the esplanade that connects to Andrew Haswell Green Park at 62nd Street and will include a pedestrian bridge to East 54th Street. The pier structure will be founded on piles drilled into bedrock in the East River. All piles will be rock-socketed into bedrock and filled with rebar cages and concrete/grout. On the topside, a bike path will be constructed on top of the tub girders. The tub girders will allow for soil installation to support the various landscaping and tree system. A walkway path will run adjacent to the bike path and will feature various seating and railing options for pedestrians to enjoy the space. The esplanade will also include various light fixtures, irrigation systems, and watering stations (hose and public water fountains). At E 54th Street, there will be a steel and concrete pedestrian bridge erected. This bridge will span from Sutton Place Park, over the FDR, and onto a pile supported structure at the esplanade. www.encardio.com

  2. WHY MONITORING? The instrumentation monitoring plan included installation of crack meters and tiltmeters with wireless dataloggers on the existing retaining wall. This was required to monitor changes in existing cracks as well as tilt in the retaining wall, caused due to the construcon activities. MONITORING SOLUTION Rite Geosystems Inc., our USA Company was enstrusted to provide complete instrumentation for the project. Scope of works include: Supply of geotechnical instruments Automatic monitoring with dataloggers INSTRUMENT USED Used to monitor existing cracks on the retaining wall along FDR and on the FDR columns Used to monitor angular distortion of the retaining walls along the Andrew Haswell Park and/or the FDR columns. Automatic dataloggers with GSM/GPRS modem to collect and transfer the data at cenral server Crack meters Tiltmeter Datalogger The project may require our tiltmeters also in the future to monitor the angular distortion of retaining walls along the Andrew Haswell Park and/or the FDR columns. RESULTS Installation of the above mentioned instruments has been executed successfully, giving the client necessary information required for smooth progress of the project. The wireless datalogger collected the data from the instruments a required frequency and transferred it to a remote server/PC to be easily accesed by stakeholders. Crack meters installed across existing cracks ENCARDIO-RITE ELECTRONICS PVT. LTD. A-7, Industrial Estate, Talkatora Road Lucknow, UP - 226011, India | P: +91 522 2661039-42 | Email: geotech@encardio.com | www.encardio.com International: UAE | Qatar | Bahrain | Bhutan | Morocco | Europe | UK | USA India: Lucknow | Delhi | Kolkata | Mumbai | Chennai | Bangalore | Hyderabad | J&K www.encardio.com