1 / 17

MP MWIG, ACIP AND NTP Presented by: B.J Matshiane

MP MWIG, ACIP AND NTP Presented by: B.J Matshiane Designation & Directorate : WATER SECTOR SUPPORT Date: 30 October – 01 November 2013. Presentation Layout. CONTENTS. A: Expenditure Status 2013/14 RBIG MWIG NTP ACIP B: Key Challenges Project to be “Fast Track”

erna
Download Presentation

MP MWIG, ACIP AND NTP Presented by: B.J Matshiane

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MP MWIG, ACIP AND NTP Presented by: B.J Matshiane Designation & Directorate : WATER SECTOR SUPPORT Date: 30 October – 01 November 2013

  2. PresentationLayout CONTENTS A: Expenditure Status 2013/14 • RBIG • MWIG • NTP • ACIP B: Key Challenges • Project to be “Fast Track” • Projects to be Launched • Way forward

  3. A1. RBIG : Expenditure 2013/14

  4. A1. RBIG : Expenditure 2013/14

  5. A1. RBIG : Expenditure 2013/14

  6. RBIG Challenges • Finalisation of IRS • Lack of direction on operational structure • Delays in procurement processes by IA (appointment of contractors i.e eMalahleni) • Capacity of IA (especially the municipalities)

  7. A2. MWIG: Expenditure 2013/14

  8. A2. MWIG: Expenditure 2013/14

  9. MWIG Cont.... Challenges • Poor Planning • BP only submitted end July • No approval issued yet to municipality to continue to next phase (procurement) • Non achievement of milestones • Lack of clear process flow (adhoc basis) • Non achievement of milestones • Poor Quality of BPs • Incomplete BPs submitted for approval • Unclear scope description (no site verification by DWA PSP) • Delays in submitting Technical Reports/Designs • Withholding of funds (R44, 735 for Q2) due to non-compliance • IA appointed (Rand Water) not complying to requirements despite numerous engagements • Mis-appropriation of funds • Relationship between DWA & WSAs

  10. NTP Projects

  11. A4: NTP – Expenditure 2013/14 EXPENDITURE

  12. B: NTP Challenges CHALLENGES • BLM has not submitted 2013/14 RPP, meeting was held on 25 Oct, it was agreed that the RPP will be submitted on 01 Nov. • Poor planning by WSA’s • Lack of communication between Finance and Technical • High Tech Staff turnover • Political interferences • O&M not prioritised • Misappropriation of funds (funds not ring-fenced)

  13. A3. ACIP : Expenditure 2013/14

  14. B: ACIP: Challenges • Due to extent / conditions of some WWTW, budget allocated is minimal to meaningful contribution • Time for Budget approval results in late start of project implementation. • Projects approved at times are not of critical as compared to rejected/ non approved projects.

  15. Projects to be Launched RBIG • Ermelo Phase 1: May 2012 • Emalahleni Phase 3 (May 2014) ACIP • Empuluzi Water project to be launched in February 2014 • Mhlatikop project to be launched in March 2014 • Leandra Project to be launched in March 2014

  16. Way forward • Finalisation of structure / provision of interim dedicated support • Re-allocation to priority projects • Conversion of MWIG to schedule 6 especially for (Thaba Chweu/BLM) • Expand IA list to include Consultants to off-load water-boards as it is evident that they are not coping

  17. THANK YOU

More Related