90 likes | 219 Views
AIP Magnet PS and Controls Upgrade. BSY Controls Cost Estimate Kristi Luchini. BSY Magnet Controls SCOR to MCOR Upgrade Cost Estimate Summary. Total M&S: $ 4600.00 Total Labor + ED&I: $ 5700.00 Total Software: $ 4200.00 without Burden and Contingency Total: $14,500.00
E N D
AIP Magnet PS and Controls Upgrade BSY Controls Cost Estimate Kristi Luchini
BSY Magnet Controls SCOR to MCOR Upgrade Cost Estimate Summary • Total M&S: $ 4600.00 • Total Labor + ED&I: $ 5700.00 • Total Software: $ 4200.00 • without Burden and Contingency Total: $14,500.00 • Contingency 10% of M&S: $ 460.00 • Burden 30% of M&S: $ 1380.00 • with Burden and Contingency Total: $16340.00
BSY Magnet Controls Upgrade Cost Estimate Detailsblue: needed for minimal SCOR to MCOR upgrade
Network Block Diagram For BSY Upgrade Ethernet NetworkSwitch swh-b136-nw01 crate PLC ca fbck Terminal Server ts-b136-nw02 EPICS IOC Timing EPSC (Q50Q1-3) EPSC (50B1-2) EPSC (52AGF1-2 MCOR Bulk MCOR Upgrade
4 3 2 Port D Port C Port B Port A Trans 200 1 Slot VME Crate and I/O Front View Rear View 4 3 2 AVME9670 1 MVME 6100 Debug Lan 1 Lan 2 M C E V P R Slot