LOI – Next Steps?

LOI – Next Steps?. John Thomason. ISIS Schedule. Experiments in R5.4 to show full operation of system with integration of ISIS LPRF, cure for oscillations in IA, etc. ISIS staff complete break-out box and cabling to

erno
Download Presentation

LOI – Next Steps?

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LOI – Next Steps? John Thomason

  2. ISIS Schedule

  3. Experiments in R5.4 to show full operation of system with integration of ISIS LPRF, cure for oscillations in IA, etc. ISIS staff complete break-out box and cabling to synchrotron and prepare LOI HPD and water manifold for move to synchrotron SP6 First experiments with beam in synchrotron Assumes:  January experiments go well  4 x ISIS 2RF systems fully commissioned  ISIS management approval to operate so close to first real TS-2 beam Possible Workplan (1)

  4. May/June 2008

  5. Experiments in R5.4 to show full operation of system with integration of ISIS LPRF, cure for oscillations in IA, etc. ISIS staff complete break-out box and cabling to synchrotron and prepare LOI HPD and water manifold for move to synchrotron SP6 First experiments with beam in synchrotron Assumes:  January experiments go well  4 x ISIS 2RF systems not fully commissioned  No ISIS management approval to operate so close to first real TS-2 beam Possible Workplan (2)

  6. August/September 2008

  7. Experiments in R5.4 to show full operation of system with integration of ISIS LPRF, cure for oscillations in IA, etc. ISIS staff complete break-out box and cabling to Synchrotron SP6 Further experiments in R5.4 First experiments with beam in synchrotron (to be decided after June experiments) Assumes:  More experiments in R5.4 needed  4 x ISIS 2RF systems fully commissioned  ISIS management approval to operate so close to first real TS-2 beam Possible Workplan (3)