1 / 21

Project Coordination Activities

Project Coordination Activities. Meeting with Cape Cod National Seashore – August 27 Cape Cod Commission USDA Meeting – September 16. Nauset Regional High School. Drill Site. Drill Site at NRHS. Mud System. Drill Cuttings - Aquifer Zone. Well Screen. Well Development.

erol
Download Presentation

Project Coordination Activities

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Project Coordination Activities • Meeting with Cape Cod National Seashore – August 27 • Cape Cod Commission • USDA Meeting – September 16

  2. Nauset Regional High School Drill Site

  3. Drill Site at NRHS

  4. Mud System

  5. Drill Cuttings - Aquifer Zone

  6. Well Screen

  7. Well Development

  8. Nauset High SchoolHydrogeologic Conditions Deep boring installed to 400’ Water table at 50’ Good material to 105’ Silts and clays below Installed well at 90’

  9. District H

  10. District H Hydrogeologic Conditions Summary • Deep boring: 405’ bgs • DTW – 30’ bgs • Potentially productive zones: Shallow 106-116’ bgs Intermediate 207-217’ bgs • Freshwater/Saltwater Interface 343 feet

  11. District HWell Installations Deep well: 346’ Intermediate well: 207’ Shallow well: 116’

  12. District H Well Development

  13. District H Well Development

  14. District H Drill Log • Potentially productive aquifer zone (sand) 80-218’ • Fresh Water/Salt water interface: 143’ bgs • Specific Capacity Shallow: 33 gpm/ft Intermediate: 5-10+ gpm/ft • Water quality: Shallow – excellentIntermediate – Waiting on data Fresh Water Salt Water Sand Silt and Clay

  15. District H Hydrogeologic Issues • Response of salt water transition zone with pumping • Proximity of vernal pools • Groundwater/vernal pool interaction

  16. District H Deep Test Well Tidal influences on water level in deep test well

  17. Single Family Residential > 80,000 sq. ft. Single Family Residential 40,000-79,999 sq. ft. General Business Conservation/ Passive Recreation General Industrial Vernal Pools

  18. District G Drill Site • Drill site and 400’ buffer entirely within Town-owned land • Currently installing deep boring • Site has available land for more than one test site

  19. Eastham Water Supply InvestigationsUpdated Schedule

  20. Discussion

More Related