An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PHENIX Run-13 status Hubert van Hecke Hubert van Hecke - 19 Feb 13 Time meeting

  2. Commissioning continues VTX stripixels • Commissioning was going well in December, but • Massive leaks were seen in the outer barrel layer of the VTX (stripixels) • Removed the East half of the detector, disassembled it, reassembled with only the FVTX, and reinstalled in the IR • Investigation identified galvanic corrosion between carbon and Aluminum as the cause • VTX pixels (inner 2 barrels) and FVTX don’t use Aluminum FVTX VTX pixels FVTX VTX stripixels Hubert van Hecke - 19 Feb 13 Time meeting

  3. Commissioning continues • FVTX back and operating (>98% live channels) • Flammable gas is on since Feb 1, 2-person watch shifts started Jan 22 • Cosmicstakensince 4 Feb, ongoing when no beam • Shielding wall rolled in on7 Feb, area closed up on 8th • Test runs with all (~20) subsystems today Hubert van Hecke - 19 Feb 13 Time meeting

  4. Near-term objectives • When no beam, run cosmics • Cosmics are needed to study momentum smearing, charge-sign efficiencies, trigger issues, backgrounds etc. • Cosmics will be collected in beam down-time periods throughout the run • Commission with beam as it arrives • Access during the day, as needed Hubert van Hecke - 19 Feb 13 Time meeting