1 / 5

PHENIX Status

PHENIX Status. Time Meeting, 2/9/2010 Stefan Bathe. Sampled Integrated Luminosity. 0.55 / 1.4 ( nb ^-1) = 39 % of goal (for sampled int. lumi .). 30 /70 (days) = 43 % of time. DAQ Performance.  if rate had been > 5 kHz at all times:

amil
Download Presentation

PHENIX Status

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PHENIX Status Time Meeting, 2/9/2010 Stefan Bathe Stefan Bathe for PHENIX, Time Meeting

  2. Sampled Integrated Luminosity 0.55 / 1.4 (nb^-1) = 39% of goal (for sampled int. lumi.) 30/70 (days) = 43 % of time Stefan Bathe for PHENIX, Time Meeting

  3. DAQ Performance  if rate had been > 5 kHz at all times: could have recorded 4.49 billion events or 0.66 nb^-1 # events Int. lumi. in nb^-1 x10^6 Delivered beam ± 30 cm (PHENIX on) Taking min bias data: with |z| < 30 cm if DAQ rate < 5 kHz with |z| < 20 cm if DAQ rate > 5 kHz Recorded beam ± 30 cm (PHENIX on): 77 % Delivered beam ± 20 cm (PHENIX on) Recorded beam ± 20 cm (PHENIX on): 86 % HBD acceptance: ± 20 cm Stefan Bathe for PHENIX, Time Meeting

  4. Beam z Profile Now: 50-60 % Run-07: 50 % Projected Run-10: 65 % Begin fill: 59 % After 3 h: 50 % Stefan Bathe for PHENIX, Time Meeting

  5. Plan for Maintenance Day • MuTrFEM and HV fixes • Change MuTrigTLD's on South Station-1 • Fix West Carriage light • HBD rack work • RPC work in North Tunnel Stefan Bathe for PHENIX, Time Meeting

More Related