1 / 0

Discussion on VDI Implementation

Discussion on VDI Implementation. Mark Kroska mkroska@creativememories.com. Who is Creative Memories?. Creative Memories is memory preservation *traditional scrapbooking albums, covers, tools, papers, embellishments and accessories *digital scrapbooking

errin
Download Presentation

Discussion on VDI Implementation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Discussion on VDI Implementation Mark Kroska mkroska@creativememories.com
  2. Who is Creative Memories? Creative Memories is memory preservation *traditional scrapbooking albums, covers, tools, papers, embellishments and accessories *digital scrapbooking software for PC and Mac, photo and project storage, digital content
  3. Creative Memories by the numbers In business since 1989 Bankruptcy in 2008/9 450 employees 30,000 consultants worldwide $120MM annual revenue 3 locations: St. Cloud (Clearwater Road) St. Cloud (off Opportunity Drive) Yellow Springs,Ohio
  4. Creative Memories Infrastructure 2 St. Cloud locations connected by 2x 1G fiber YSP connected by 4.5M MPLS 2008 R2 AD domain HP DL380 G6 and G7 VM hosts 20 VM hosts (12 server / 8 VDI) Extreme core and access switches NetApp 3040 and 3020 storage
  5. Infrastructure Environment 35 physical servers (non-VM hosts) 186 VM servers Servers are 84% virtual – at goal 115 desktops (most over 5 yrs old) 102 laptops (most over 5 yrs old) 355 VDI desktops Desktops are 62% virtual – goal is 85%
  6. The Project… Objectives (required) Deliver a consistent reliable desktop (by…) Reduce the number of installed applications Reduce / eliminate the need for admin rights Identify and centralize management of “miscellaneous” desktop configuration attributes We are using this project to “get to know” our desktop configuration Ex: hundreds of differently configured ODBC connections. These are reduced in number and centrally managed / assigned to users through GP Prefs. Reduce the number of images to ONE* Due to legacy physical hardware we still have 32 and 64 bit images. All VMs and newer computers originate from the same master 64bit image. Note: the 64 bit image does go through an additional customization phase before becoming a Parent VM. Keep systems up-to-date Provided an opportunity to bundle in other upgrades (i.e.: Office 2010)
  7. The Project… Objectives (required) Turn the desktop into a ubiquitous resource Secure desktop access from anywhere* Get the desktop from home or away, and in phase 2 also offline Your desktop in any meeting room Re-purposed old laptops as mobile view connection terminals
  8. The Project… Objectives: (nice to have) Thinapp a majority of applications –updated packaging strategy Reduce Power Consumption Reduce Storage Footprint Reduce time to deliver and time to recover The overall time to deploy a desktop to a new user or recover from failed equipment on an existing user is lessened greatly.
  9. The Project… Objectives: (out of scope) Offline desktop We determined we didn’t want to spend the time and resources ensuring a great Offline desktop experience right away so this will roll out as a new feature after all users are converted. Security Server Did not implement due to the lack of PCoIP support Took advantage of existing SSL VPN and other tools to create a Remote Access Solution. Change Anti-virus Switch to FEP Not using vShield Zones
  10. Deliverables 85% of users are on View and fully upgraded to Windows 7 Mac users, frequent travelers and specific applications on hardware make up the remaining 15%
  11. Does this sound familiar?
  12. Our approach… “ONE image”* View Specific info: For Composer we chose Sysprep over Quickprep Works well with our already in place KMS infrastructure Don’t need the speed of Quickprep since we won’t be constantly refreshing or recomposing Two View Connection Servers load balanced behind an F5 LTM Thinapp assignment didn’t meet our needs… Went with Group Policy Software Installation Has some quirks, but it works. User or group based application assignment View Parent Image Many core / commonly used applications are on our parent with less used applications assigned on a per user basis.
  13. Our approach… View composer pools Chose to create all VMs in a pool in advance, though the on demand feature does work well. We have five identical 50 VM pools labeled “Windows 7 A, B, C, etc...” A sixth pool with increased resources Some stand-alone VMs for users with special needs View Connection Broker We DO NOT tunnel the view client connection through the broker Remote Access for View Bundled/Packaged View Client with our SSL VPN for an easy one click install
  14. Our approach… Image Customization: WAIK is awesome (Windows Automated Installation Kit) Extensively to customize the image Get your image update process worked out Group Policy and Group Policy Preferences (all kinds of awesome) Excellent targeting capability With AD level 2008+ Printers Adding printers using subnet or other data that is populated from View to the volatile environment hkcu\Volatile Environment ODBCs by user / group Start Menu and Folder View customization by user / group Files or Folders assigned by user / group
  15. Our Timeline… Planning and preparation phase (3 months – Aug – Oct) This time used to prepare the master WIM (Windows Image) Package applications Create Group Policies Setup Environment Preliminary Testing More…
  16. Our Timeline… Testing / Piloting Phase (2 months – Nov – Dec) Identified users Tested migration scenarios Determined what scenario we wanted to use for migration Discovered bugs / problems Made constant tweaks, adjustments and fixes to issues found More…
  17. Our Timeline… Rollout Phase (4 months – Jan – Apr) Combined training and migration into one, as users attend training they are migrated. Provided self help resources Followed up each migration with a survey to assess and improve the process Placed View stations throughout the building in meeting rooms and available at mobile stations. More…
  18. Lessons Learned Adobe Products don’t play nice with folder redirection Folder Redirecting Appdata burned up the maximum connections to our file server VMware Personas was not released with 4.5 Computer / Pool centric assignment of ThinApps Lack of disk space prompted us to go for a rolling upgrade rather than move all users at once. Cannot run high end design, engineering or graphical apps. Some App Compatibility problems Thinapp Compatibility / ThinApp packaging problems
  19. Lessons Learned Driver Compatibility with legacy peripherals and some peripheral pass through problems View Configuration: Make sure your vcenter / vmcomposer account is the same used for vcenter and AD and has access to your customization templates, can add computers to the correct OU Microsoft Licensing (prompting inconvenient work-arounds) Dealing With Office Activation Dealing with Windows activation / Sysprep Design a process to WORK AROUND this problem. A four part image management process Reference Serviceable Prepped – (becomes the WIM) Backup / Last Known Good
  20. Myths about VDI “It’s a technology project” “A pilot program for VDI is optional” “Licensing gets much simpler with VDI” “VDI will save time right away” “VDI will save money right away” “VDI cannot satisfy a tech savvy user” “If we do server VMs, desktops have no learning curve”
  21. What’s Next? Calculate actual costs and returns More hotel and conference room stations Offline VDI A better A/V solution (vShield?) New versions of View
  22. Q & A