30 likes | 157 Views
SIP interoperability status (ITSP status). Completed = Test completed Testing = In Lab Testing TBD = To be done. SIP interoperability status (ITSP status). SIP interoperability status (ITSP status).
E N D
SIP interoperability status (ITSP status) Completed = Test completed Testing = In Lab Testing TBD = To be done