1 / 15

Determining Watershed Parameters for Water Rights in the Cypress River Basin

Determining Watershed Parameters for Water Rights in the Cypress River Basin. By: Hema Gopalan GIS in Water Resources (C E 394K) Fall 2001. Background. Development of Water Availability Model (WAM) by TNRCC. 2. The model should determine:. ?. ?. Whether sufficient water is available

esparzal
Download Presentation

Determining Watershed Parameters for Water Rights in the Cypress River Basin

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Determining Watershed Parameters for Water Rights in the Cypress River Basin By: Hema Gopalan GIS in Water Resources (C E 394K) Fall 2001

  2. Background • Development of Water Availability Model (WAM) by TNRCC 2. The model should determine: ? ? • Whether sufficient water is available • Amount of water for each water right • Percent of time it is available ?

  3. WRAP model • TNRCC provides location of water rights, CRWR determines • Watershed parameters for those water rights and the contractor • uses the parameters to provide water availability data. • Wrap1117 project developed in ArcView 3.2 to establish • watershed parameters for water rights. • 19 out of the 22 basins completed.

  4. Parameters • Upstream areaof each control point 2. Average upstream precipitation 3. Average upstream Curve Number 4. Connectivity of water rights 5. Flow length to outlet

  5. Exciting Cypress !!!

  6. The Mess Control points Stream network

  7. Buffer zone and surrounding streams • The basin outline is buffered • by a 10 Km zone • This is to ensure all appropriate • areas are captured • All streams must drain • off the DEM for proper • grid processing

  8. Grids Grids Grids!!! DEM grid Burn Grid Flow Accumulation grid Flow Direction grid Fill grid

  9. More grids… Average precipitation Average CN

  10. DEM stream network 64 32 128 Original stream network 1 16 8 2 4 DEM stream network

  11. Snapped control points to DEM stream Snapped control points Original control points

  12. Watershed Delineation Network created to determine connectivity between control points Watershed boundaries are delineated for each control point

  13. Results Comparison of results with USGS data Percent difference should be less than 3 % HUC area for Gage 7346000 is 893Mi2

  14. Acknowledgements Dr. Maidment Melissa Figurski Research group at CRWR

  15. Q U E S T I O N S ????