Hydrograph Modification Management Using Simplified Low Impact Development Design. Christie Beeman, P.E. Philip Williams & Associates. precipitation. runoff. infiltration. Hydrograph Modification. Pre-Development. Time. Hydrograph Modification.
E N D
Hydrograph Modification Management Using Simplified Low Impact Development Design Christie Beeman, P.E. Philip Williams & Associates
precipitation runoff infiltration Hydrograph Modification
Pre-Development Time Hydrograph Modification Urbanization tends to increase stormwater runoff: • volume • peak flows • frequency Post-Development Runoff
Hydrograph Modification Management • SFRWQCB adding C.3 to Bay Area NPDES permits • C.3.f requires Hydrograph Modification Management Plan (HMP) • Control runoff peak flows & durations to pre-project levels • Prevent erosion impacts to receiving streams
Contra Costa HMP - approach • Encourage LID for Hydrograph Modification Management • Guidelines already in place for water quality treatment • Typical details • Sizing spreadsheet • Expand for hydrograph modification management
Contra Costa HMP: Compliance Options • Compare Pre- and Post-project Site Conditions • Implement LID using IMP Gallery • Design details, specifications and sizing factors • Demonstrate flow peak and duration mitigation • Continuous hydrologic model • Flow peak and duration control • Assess risk of erosion impacts (receiving stream) • Demonstrate low risk of erosion • Propose alternative mitigation
LID Integrated Management Practices • Mimic natural hydrologic conditions • Retention, infiltration • Can fit in site landscaping • Practical for small projects precipitation runoff infiltration
Contra Costa HMP Challenge: • Hydrograph Modification Management IMP design guidance • Make IMP design and sizing easy • Demonstrate peak and duration control Solution: • Develop IMP sizing factors using continuous simulation hydrologic model
IMP Design Guidance – sizing factors • Develop Pre-Project and Post-Project Runoff Time Series using HPSF • Flow peak and duration plots • Build IMPs into the HSPF model • Adjust IMP size until peak and duration plots below pre-project • Sizing factor = (facility size)/(area managed) • Most sizing factors between 0.05 and 0.13
LID Integrated Management Practices • Planter box • Infiltration trench/basin • Vegetated swale • Bioretention basin • Dry well
IMP Sizing Worksheet Define Project DMA Input IMP Sizing
A soils D soils IMP Sizing Worksheet - example
1 2 3a 4a 5 4b 3b 6 3c IMP Sizing Worksheet – Delineate DMAs
IMP Sizing Worksheet – DMA inputs 1 2 3a 4a 5 4b 3b 6 3c
IMP Sizing Worksheet – DMA inputs 1 2 3a 4a 5 4b 3b 6 3c
1 2 3a 4a 5 B C 4b 3b C B 6 3c B A IMP Sizing Worksheet – DMA inputs
C 1 2 B 3a 4a 5 4b 3b C 6 B 3c A B IMP Sizing Worksheet – Select IMPs 1 2
C 1 2 B 3a 4a 5 4b 3b C 6 B 1 3c 2 A B IMP Sizing Worksheet –IMP dimensions
C 1 2 B 3a 4a 5 4b 3b C 6 B 1 3c 2 A B IMP Sizing Worksheet –IMP size