Highway and Road Projects:When to Treat Runoff William Fletcher Water Resources Program Coordinator Geo/Environmental Section ODOT
Drivers Clean Water Act • 401 Water Quality Certification for projects requiring 404 permits • NPDES MS4 permits • TMDLs and 303(d) listings for water quality limited streams
Drivers Endangered SpeciesAct Stormwater management expectations are incorporated into SLOPES IV
Triggers Adding New Impervious Surface Area • New roads • New or modified alignments • Wider roads, including wider shoulders
A touch of Pragmatism No one really cares about very small increases in non-traffic bearing new impervious surface area, as long as it doesn’t change the treatment or routing of stormwater from other impervious surfaces • Bases for signs • Police car pads • Guardrail flares
What about bike paths and sidewalks? Not if they are separated from the road, where the intervening ground is unpaved and vegetated, However Bike paths that are really widened roads, and sidewalks that include adding curbs do trigger the need for treatment
Triggers Modifying the drainage system • Changing the type of conveyance (ditch to pipe etc.) • Changing the location of the conveyance • Enlarging the conveyance • Substantially increasing the amount of water carried by the conveyance (Changing the CIA)
More Pragmatism • Minor changes, such as relocating an inlet, do not trigger the treatment requirement • Repairs to the drainage system do not trigger the treatment requirement However • A major replacement of a system could require treatment.
Triggers Adding, Replacing or Widening Stream Crossing Structures
Not included are: • Seismic Retrofits • Repaving • Structural Repairs • Culvert End Replacements or Extentions
Triggers • Projects that require a CWA 404 permit and “involve” impervious surfaces. • “Involve” includes all of the above plus projects that reconstruct a road by removing pavement down to base grade and repaving the surface.
This does not include fixing sink holes in the road, utility repair, or replacing short segments of highway to repair damage.
Water Resources Goals Treat All the stormwater from the Contributing Impervious Area Generated by the Water Quality Design Storm Using Preferred Best Management Practices
Do you need to build something? Not Necessarily • Right soils and enough room to infiltrate the stormwater • Sheet flow from the edge of pavement through vegetation • Divert stormwater through vegetation
Preferred BMPS • Infiltration techniques • Bioretention facilities • Bioslope (“Ecology Embankment”) • Amended Soil Swales and Filter Strips • Treatment wetlands
Resources • ODOT Stormwater Management Program Web Page • ODOT Geo/Environmental Section Technical Bulletin 09-02(b) • ODOT Water Quality Guidance Document, with Appendices • ODOT Hydraulics Manual • DEQ 401 Program Web Page • SLOPES IV (on ODOT G/E Web Page)