CMS High Eta U pgrade Electronics System. PAC Trigger. GEM. Interface and driver board. R. De Oliveira. Trigger DAQ DCS TTC. Ser/Des. Trigger. Counting room. Front-ends VFAT/ GdSP. K.Bunkowski et al. P.Aspell et al. GBT. P.Moreira et al. Optical link @ 3.2Gbps. GLIB. P.
E N D
CMS High Eta Upgrade Electronics System PAC Trigger GEM Interface and driver board R. De Oliveira Trigger DAQ DCS TTC Ser/Des Trigger Counting room Front-ends VFAT/GdSP K.Bunkowski et al. P.Aspell et al. GBT P.Moreira et al. Optical link @ 3.2Gbps GLIB P. Vichoudis et al. DC/DC converters F. Vasey et al. F. Faccio/ G. Blanchot et al. ~10V LV Power Supplies HV
The readout system evolution & estimation of time-line Today : VFAT2 , Turbo hardware and Labview DAQ software Comments very few VFATs available, extra VFATs to be ordered in 2011 Medium term : VFAT2 (on new hybrid) + SRS Aim is to have VFAT2 and SRS as a complete available system. Future : VFAT3/GDSP + GBT + GLIB GBT possibly available in ~ 2 years VFAT3/GDSP depends on design team resources. 2011 From ~ 2014