CMS High Eta Detector - Feasibility Studies PROPOSAL BEAM TESTS 2010 AS 26.2.2010. PHASE I [Standard beam 1 week] Proto 1 (10x10 Standard) Time resolution as function of gas, induction field Proto 2 (10x10 Honeycomb) Gain uniformity, Efficiency
E N D
CMS High Eta Detector - FeasibilityStudies PROPOSAL BEAM TESTS 2010 AS 26.2.2010 PHASE I [Standard beam 1 week] Proto 1 (10x10 Standard) Time resolution as function of gas, induction field Proto 2 (10x10 Honeycomb) Gain uniformity, Efficiency Proto 3 (10x10 Tech Etch) 1 week Gain Uniformity, Efficiency PHASE II [Standard Beam & Magnetic Field 1 week] Proto 1 (10x10 Standard) Space / Time resolution as function of incident angle and magneticfield Proto 3 (10x10 Tech Etch) Space Time resolution as function of incident angle and magnetic field Full SizeProto I Efficiency, Gain Uniformity PHASE III Use Proto 1,2,3 to play with r/o strip size Full Size Proto I Efficiency Gain Uniformity, Time Resolution, Gas optimization, Cluster Size, Noise, Electronics, Magnetic Field
CMS High Eta Detector - FeasibilityStudies PROPOSAL LAB TESTS 2010 AS 26.2.2010 PHASE II June – July – August Proto 1 (10x10 Standard) Time resolution, efficiency, noise electronics, performance as function of gas mixture ? Proto 2 (10x10 Honeycomb) – Long term X-ray ? Proto 3 (10x10 Tech Etch) – Long term at GIF ? Large Proto I – General Characterization Simulations: HV divider, chamber, circuit simulation (AS, SC) PHASE I March – April – June Proto 1 (10x10 Standard) Time resolution, efficiency, noise electronics, performance as function of Ei, gas mixture (AS, AM) Proto 2 (10x10 Honeycomb) characterization, efficiency, noise electronics, performance as function of gas mixture (AS, AM, new collab) Proto 3 (10x10 Tech Etch) Time resolution, efficiency, noise electronics, performance as function of gas mixture (AS, new collab) Simulations: GAS FLOW with realistic detector components (AS,SC) HV divider, chamber, circuit simulation (AS, AM,SC) Beam test 2009 - data analysis (AS,MT, HT ) Prep for 2010 Large Proto I – Assembly and Construction (AS, AM) PHASE III Sep – Oct – Nov Proto 1 (10x10 Standard) Long term GIF ? Proto 2 (10x10 Honeycomb) - Lob term X-ray ? Proto 3 (10x10 Tech Etch) – Long term at GIF ? Large Proto I – Beam tests and analysis Simulations: GAS FLOW