100 likes | 271 Views
HES-HKS & KaoS meeting. 2Apr2012 T.Gogami. 20Mar2012 @ SURA residence facility. Contents. OPERA machine. JLab trip. 3/6 – 3/21 @JLab First half Preparing OPERA machine (IT help desk) GEANT (SPL + ENGE) Analysis meeting (3/7) Meeting with Jay (3/7 , 3/9) Last half ODH, Rad Worker1
E N D
HES-HKS & KaoS meeting 2Apr2012 T.Gogami 20Mar2012 @ SURA residence facility
Contents • OPERA machine
JLab trip • 3/6 – 3/21 @JLab • First half • Preparing OPERA machine (IT help desk) • GEANT (SPL + ENGE) • Analysis meeting (3/7) • Meeting with Jay (3/7 , 3/9) • Last half • ODH, Rad Worker1 • Preparing OPERA machine (IT help desk, Steve, Tang, Han) • 3/15 PC arrived • 3/16 JLab domain • 3/17 OPERA installation • CAD (3/15 - 20) • Old SPL + HKS (check) • Old SPL + ENGE (modify) • Meeting with Jay + Chiga (3/16) • OPERA installation • Strategy • Free discussion • JLab user town meeting (3/16) • OPERA (TOSCA) (3/16 – 20) • Old SPL modeling • Old SPL + HKS 17Mar2012 @ Res fac.
OPERA machine • 置き場所 • CEBAF Center F306 の窓際 • スペック • メーカー : ASUS • CPU : Intel(R) Core(TM) i7-2600 @ 3.4GHz • プロセッサの数 : 8 • メモリ : 2 x 4 = 8GB • HDD : 750GB • OS • Red Hat Enterprise Linux Workstation release 6.2 (Santiago) tfarm1 thk Wiki : http://lambda.phys.tohoku.ac.jp/~db/mediawiki/index.php/Thk
OPERA manager インストーラ : http://lambda.phys.tohoku.ac.jp/~db/mediawiki/index.php/TOSCA 参照
Modeling OPERA (modeler)
What we need to give to Jay • Model of • Old SPL • Old SPL + ENGE (tilted) • Final geometrical information
Things to do • Before HES-HKS collaboration meeting (5/9) • More reliable initial matrix for old SPL + ENGE • New GEANT (almost done) + better TOSCA calculation • Missing mass • Kawamaand Chunhua matrices • HES tracking code • Chi square distribution, residuals, x-t relation….