Cumulative effects assessment

Cumulative effects assessment. Cumulative effects assessment. Approach Scoping: focus on VECs and VSECs where potential for cumulative effects existed - regardless of whether the effect was significant identified past, present and potential future projects

Download Presentation

Cumulative effects assessment

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Cumulative effects assessment

  2. Cumulative effects assessment Approach Scoping: focus on VECs and VSECs where potential for cumulative effects existed - regardless of whether the effect was significant identified past, present and potential future projects identified residual effects for other projects identified the “zone of influence” for effects confirmed potential cumulative effects scope did not include a study of the cumulative effects of accidents and malfunctions

  3. Cumulative effects assessment

  4. Cumulative effects assessment Approach

  5. Cumulative effects assessment

  6. Cumulative effects assessment Approach Effects Analysis determined the potential for induced effects set 25 years for temporal extent spatial extent varied with effect

  7. Cumulative effects assessment

  8. Cumulative effects assessment Types of cumulative effects

  9. Cumulative effects assessment Types of cumulative effects

  10. Cumulative effects assessment Approach

  11. Cumulative effects assessment Approach Mitigation: appropriate mitigation identified, as required Significance compare effects against known or derived thresholds and land use plan expectations Follow-up program designed as needed

  12. Cumulative effects assessment Potential cumulative effects

  13. Cumulative effects assessment Potential for other projects to use infrastructure Analysis 1 in 1000 exploration projects result in a mine 2% chance that the construction of a road will spawn the development of a mine in the north within a 300 km radius Result maximum 5% chance that a mine will result because of Zinifex infrastructure i.e., 1 or 2 mines

  14. Cumulative effects assessment Results no significant adverse cumulative effects identified identified cumulative effects can be managed through project-specific mitigation and adjusted through monitoring