Scope of Problem. Remaining Problems facing NPRR425 Modeled unit(s) paired with corresponding GSU transformers 10 of the 93 modeled wind units would need to be modified in ERCOT’s model to meet the criteria.
E N D
Scope of Problem • Remaining Problems facing NPRR425 • Modeled unit(s) paired with corresponding GSU transformers • 10 of the 93 modeled wind units would need to be modified in ERCOT’s model to meet the criteria. • There are 17 of the 63 registered wind sites that have single units/multiple GSUs or low side kV Bus-ties modeled. • Allowable differences between physical and modeled units