HBD construction status I. Ravinovich for Weizmann group I. Ravinovich
The final design of HBD • The design of the vessel is basically finished. • The engineering drawings for the parts of the vessel are basically done. • The small parts like: • HV holders for SHV; • gas inserts; • inserts for the GEM modules screws; • screws for the GEM modules; are in production. • Now they are working on the design of the jigs I. Ravinovich
The final design of HBD I. Ravinovich
The final design of HBD I. Ravinovich