PROPOSED US 34 IMPROVEMENT (4-LANE EXPRESSWAY)

PROPOSED US 34 IMPROVEMENT (4-LANE EXPRESSWAY). CARMAN RD. TO TR 111 (1350 E) – (8.1 MILES). Construction Plan Preparation – Funded (Strand Assoc.). Plan Preparation has been put on hold due to levee decertification

evelia
Download Presentation

PROPOSED US 34 IMPROVEMENT (4-LANE EXPRESSWAY)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PROPOSED US 34 IMPROVEMENT (4-LANE EXPRESSWAY)

  2. CARMAN RD. TO TR 111 (1350 E) – (8.1 MILES) Construction Plan Preparation – Funded (Strand Assoc.) • Plan Preparation has been put on hold due to levee decertification • The Phase I study and Environmental Impact Statement (EIS) will be re-opened for this section during 2012 • Currently working with FHWA to the define scope of work • Cost estimates will be revised as the study progresses

  3. TR 111 TO TR 190 E OF BIGGSVILLE WITH INTERCHANGE (4.7 MILES) Construction Plan Preparation – Funded (Poepping, Stone, Bach & Assoc.) Utility Adjustments – Funded Land Acquisition – Funded Construction Engineering – Funded Construction – Funded • Plan Preparation and Land Acquisition are underway • Anticipate Late Fall 2012 Letting • Funded through the Illinois Jobs Now! Program

  4. TR 190 EAST OF BIGGSVILLE TO S. OF KIRKWOOD (4.5 MILES) Construction Plan Preparation – Funded (Geotech Engineering & Testing) Plan Preparation nearing completion

  5. S. OF KIRKWOOD TO US 67 AT MONMOUTH (6.7 MILES) Construction Plan Preparation – Funded (CMT) Plan Preparation nearing completion