40 likes | 226 Views
US Proposed Site Survey Personnel. FTX Site Survey Personnel: USAREUR G3 TREX: 4 USAREUR G4: 1 2 CR: 4 (FTX Lead Planner, Squadron HQ representative, S4 planner, S6 planner) JMTC: 2 (TSAE, Safety) MARFOREUR: 2 (Company Ops planner, Log planner)
E N D
US Proposed Site Survey Personnel • FTX Site Survey Personnel: • USAREUR G3 TREX: 4 • USAREUR G4: 1 • 2 CR: 4 (FTX Lead Planner, Squadron HQ representative, S4 planner, S6 planner) • JMTC: 2 (TSAE, Safety) • MARFOREUR: 2 (Company Ops planner, Log planner) • USAFE/JTACs: 2 (Task1: CAS Range Site Safety Survey; Purpose1: ID safety impediments and correct or mitigate. Task2: Develop CAS scenarios based on airspace, range and target availability and geometry; Purpose2: Maximize training value for all participants) • OSURG: 1 • USAREUR G2: 1 • 21st TSC Contracting Officers: 2 • PA ARNG: 1-2 PLT Rep (SF) FTX, 1x S6/BCTC rep and 1x Ops/log rep CPX • USACE: 1 Team Lead for safety assessment of STX/FTX buildings • CPX and Theater Opening Exercise Site Survey Personnel: • USAREUR G37 TREX: 4 • USAREUR G4: 1 • USAREUR G6 or 5th Sig Cmd: 1 • JMSC: 1, 2 if possible (MAJ Schlang and Network specialist) • JMTC: 1 • 21st TSC: 4 (2x KO’s, ) • TOTAL: 35 Pax 1 1
LVA Proposed Site Survey Personnel FTX • 3.rd RLC: 1PAX • Inf BDE: 2PAX • NG: 3PAX • JHQ J-4: 1PAX • JHQ J-6: 1PAX • LC: 1PAX • LC MOVCON: 2 PAX • MOD: 2 PAX CPX • JHQ J-4: 1PAX • JHQ J-3: 1PAX TOTAL: 15 PAX
LITProposed Site Survey Personnel FTX • Lead exercise planner • Training Audience Company Commander CPX • FTX lead exercise planner • Simulations and commo planner TOTAL: 4PAX
EST Proposed Site Survey Personnel FTX • 2 personnel: Lead FTX Planner, Logistics Planner CPX • FTX lead exercise planner • Simulations and commo planner TOTAL: 4PAX