Mission Valley Power Energy Efficient Home ProgramDeemed Savings Analysis August 5, 2008
Background • Mission Valley Power (MVP) request that the RTF review its specifications for a new residential construction program to establish a deemed savings value and cost-effectiveness • MVP also provided an analysis of the potential savings from requiring R-10 full under slab insulation with an R-5 slab edge thermal break for RTF review and potential adoption as a deemed measure.
MVP Deemed Savings Analysis – R-10 Full Slab w/R-5 Thermal Break • Used WattSUN model w/Kalispell Weather • Assumed MT Code as baseline, then modeled full slab insulation w/ thermal break (UA 549) vs UA 518) • Wall (Above Grade) = R-19 • Wall (Below Grade) = R-11 (0.054 base/0.056 w/full slab) • Attic = R-38 • Glazing = U- 0.35 • Door = U-0.19 • On grade slab – R-0 (F-0.73) & R-10 w/R-5 TB (F-0.36) • Below grade slab = R-0 (F-0.56) & R-10 w/R-5 TB (F-0.42) • Savings = 1.5 kWh/sq.ft. of slab
MVP Deemed Savings Analysis – Energy Efficient Home • Used WattSUN model w/Kalispell Weather • Assumed MT Code as baseline, compared to • EStar Home BOP 2 • MVP Home specifications • Results • EStar Home BOP 2 = 32% savings • MVP Home = 36% savings
Savings Input Assumptions – Crawlspace Home, Zonal Electric *MT Code does not require below grade walls to be insulated until “finished.” EStar & MVP require R-21 insulation at time of construction.
Issues • Specifications • Perimeter insulation permitted in lieu of R-38 under floor (may not produce equivalent energy savings) • Assumed duct leakage rate for forced-air systems not specified • MVP requires 25% of sockets w/EStar Lighting, EStar requires 50% - Net impact on savings not quantified in analysis • No HRV required, even though savings are claimed for reduce infiltration • Quality Assurance • Performance testing of ducts is not required • 0.30 ach Air tightness verified by random testing (same as EStar, but EStar assumes 0.35 ach)
Results of Review – R10 Full Slab • SEEM Model used to estimate use and savings • Full R-10 Slab w/R-5 Thermal Break • WattSun Savings = 1.5 kWh/sq.ft. slab (zonal electric) • SEEM Savings = 1.0 kWh/sq.ft. slab (zonal electric) • No Cost Data Yet to Determine Cost-Effectiveness