An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MICE PID detectors & Shielding MICE CM17, CERN Feb 25, 2007 V. Palladino, Univ & INFN Napoli for the small PID team Bonesini, Chimenti, Cremaldi, Giannini, Graulich, Gregoire, Karazdov, Orestano, Sandstrom, Summers,Torun, Tortora, Tsenov, and more V. Palladino PID Detectors & shields

  2. picture & contributors Upstream PID Review requirements (almost) fulfilled (AB dixit) TOF0-I being rescued from INFN funding crisis (with CalSys, KL and TOF II) Building & making installation plans (Aug-Sep 07) CKOV (LC) TOF0/I and Cal Sys (MB, YK) Completing design of TOF I global PMT shield cage (GG) ….. to be funded ! quite effective, mitigating local PMT shielding requirements Downstream A) EMCal/KL can be completed, if funding really OK, for installation with TOF0 & I in Aug-Sep 07 (DO for LT) a (simple) review procedure should/could endorse that B) TOF II : funding being solved, for installation Mar 2008 being driven to final design from PID (MB) & Analysis (RS/MA) teams as is global PMT shield cage (GG) (RS/MA) local PMT shielding issues, more severe, being finalized measurements in mag field in progress in Milano (MB) For all above, front end (RT) and read out (JSG) electronics well defined performance requirement being properly formulated (CR) complete G4MICE performance re-evaluation being taken up seriously (YK) Then C) EMCal/SW further away, in 2008, funding not tackled yet conceptual G4MICE design well advanced, proven to be necessary AND sufficient (RS) practical design started (GG, PC, AB) V. Palladino PID Detectors & shields

  3. to Alan for preview while few last answers still being added, MICE Note soon V. Palladino PID Detectors & shields

  4. Lucien • to AB for preview V. Palladino PID Detectors & shields

  5. TOF0 & I , Maurizio OK V. Palladino PID Detectors & shields

  6. OK, if funds confirmed to be available V. Palladino PID Detectors & shields

  7. OK, if funds there V. Palladino PID Detectors & shields

  8. TOF I global shield (Ghislain) …………… NB to be funded and farmed !! After tech drawings finalized by Ghislain in consultation with Steve V. Palladino PID Detectors & shields

  9. Cage shield vs Plate shield (Maurizio) GG cage GG plate + more local iron Choice soon V. Palladino PID Detectors & shields

  10. Frascati test beam, YK So “TOFI-TOF0” < 70 ps V. Palladino PID Detectors & shields

  11. For real “TOFI-TOF0”, useful statistics only with (worse) active splitter useful to establish that time walk correction is needed (FADC) V. Palladino PID Detectors & shields

  12. Domizia (and Ludovico) KL … 3/7 exist …. can be finished for phase I , if funds NB … L. managed to make them larger than anticipated V. Palladino PID Detectors & shields

  13. V. Palladino PID Detectors & shields

  14. V. Palladino PID Detectors & shields

  15. V. Palladino PID Detectors & shields

  16. TOF II, Maurizio …. aiming at Mar 08 fixed V. Palladino PID Detectors & shields

  17. funds required, to be confirmed to be available V. Palladino PID Detectors & shields

  18. TOF II global shield, Ghislain 600 now 700 now being redone to be funded and farmed !! after tech drawings finalized by Ghislain in consultation with Steve V. Palladino PID Detectors & shields

  19. More local PMT shield needed Final word from Milano’s mag test stand V. Palladino PID Detectors & shields

  20. Radii of downstream holes and aperture (Rikard) V. Palladino PID Detectors & shields

  21. Radii of downstream holes and aperture (Marco) to be reduced AMAP! to be all checked through V. Palladino PID Detectors & shields

  22. V. Palladino PID Detectors & shields

  23. Downstream apertures yesterday’s decisions • Front plate of TOF II shield 600 mm • Lateral size of TOF II 600 mm • Back plate of TOF II shield 700 mm • Lateral size of KL 900 mm • Lateral size of SW ≥ 1000 mm } V. Palladino PID Detectors & shields

  24. front end (Roumen) PID electronics OK of splitter & stretcher for FADC digitization of all detectors and read out (J. Sebastien) electronics well defined have (or can have) it all available for TOF0, I, KL V. Palladino PID Detectors & shields

  25. 70 ps OK for longitudinal emittance, Chris ps V. Palladino PID Detectors & shields

  26. Rikard :KL + SW do the e/µ separation with 99.9 efficiency 99,8 purity See MICE Note 164 V. Palladino PID Detectors & shields

  27. SW detailed design being tackled (Pietro, Gianrossano, Alan) On the floor in 2008? TO BE FUNDED ! V. Palladino PID Detectors & shields

  28. Mechanics in Trieste prototype plane possibly soon Scibars from Fermilab V. Palladino PID Detectors & shields

  29. picture & contributors Upstream PID Review requirements (almost) fulfilled (AB dixit) TOF0-I being rescued from INFN funding crisis (with CalSys, KL and TOF II) Building & making installation plans (Aug-Sep 07) CKOV (LC) TOF0/I and Cal Sys (MB, YK) Completing design of TOF I global PMT shield cage (GG) ….. to be funded ! quite effective, mitigating local PMT shielding requirements Downstream A) EMCal/KL can be completed, if funding really OK, for installation with TOF0 & I in Aug-Sep 07 (DO for LT) a (simple) review procedure should/could endorse that B) TOF II : funding being solved, for installation Mar 2008 being driven to final design from PID (MB) & Analysis (RS/MA) teams as is global PMT shield cage (GG) (RS/MA) local PMT shielding issues, more severe, being finalized measurements in mag field in progress in Milano (MB) For all above, front end (RT) and read out (JSG) electronics well defined performance requirement being properly formulated (CR) complete G4MICE performance re-evaluation being taken up seriously (YK) Then C) EMCal/SW further away, in 2008, funding not tackled yet conceptual G4MICE design well advanced, proven to be necessary AND sufficient (RS) practical design started (GG, PC, AB) V. Palladino PID Detectors & shields