Goals for Step 1 Infrastructure Drawings, Layout Air Flow Calculations Specifications/Prototypes of Equipment Cabinets, Acid-Resistant Locks & Ducts, etc. Procedures Drafts Packet to D.H. by Nov 22 nd Submission to Directorate by Nov 27 th. Facility Refurbishing (Sect. 3.1). Goals
E N D
Goals for Step 1 • Infrastructure Drawings, Layout • Air Flow Calculations • Specifications/Prototypes of Equipment • Cabinets, Acid-Resistant Locks & Ducts, etc. • Procedures Drafts • Packet to D.H. by Nov 22nd • Submission to Directorate by Nov 27th
Facility Refurbishing (Sect. 3.1) Goals • (Estimate & Design to) Build air-ducts for intake of return duct to middle of lab • (..) Build air-ducts to move room supply ventilation toward middle of the room • (..) Build exhaust stack for ventilation hood Tasks and People • Design/Drafting Frank • Supervision/IB3 Experience Christian • Air-Flow Calculations Christian • Crosscheck Charlie • Material Prototype & Estimate Charlie • Work/Time Estimate Gregg
New Equipment Installation (Sect. 3.2) Goals • (Estimate to) Install recently purchased chemistry Hood. • (Estimate & Proposal to) Procure chemical cabinets with spill containment and fume removal features • (Estimate & Proposal to) Lock Cabinets and Chemical Waste Disposal Area Tasks and People • Material Prototype & Estimate Charlie • Work/Time Estimate Gregg/Charlie
Acid Transportation (Sect. 3.3) Goals • (Estimate to) Procure HDPE acid Carrier boxes. Tasks and People • Material Prototype & Estimate Charlie
Additional Modifications (Sect. 3.4) Goals • (Est. & Design to) Enclose etching area in pseudo-enclosure. • (Estimate to) Mount panic exit-bars-only on MDTL doors. • (Est. & Design to) Install secondary containment on the floor. Tasks and People • Design/Drafting Frank • Supervision/IB3 Experience Christian • Air-Flow Calculations Christian • Crosscheck Charlie • Material Prototype & Estimate Charlie/Dave • Work/Time Estimate Gary (Panic bars) Gregg (Enclosure) Charlie (Floor) • Life Safety Aspects Rich
Etching Procedures (Sect. 4.1 – 4.2) Goals (Step 1, 2 & 3 Goals are similar) • 1st Drafts of Etching & Disposal Procedures • 1st Draft of Emergency (Spill) & Medical Procedure Tasks and People • Organization/Setup/DCS Jamie • Technical Input Donna (main), Christian, Claire, Charlie, Alan • Revision/Approval Charlie • Safety Overview Rich
What a Scientist/Researcher thinks of when “procedure” is mentioned !
Training (Sect. 5) Goals • Finalize and Review Training Documentation Tasks and People • Training Preparation Dave Baird • Technical Review Charlie • Safety Review Rich (TD) ??? (AD)