Goals for Step 1 Infrastructure Drawings, Layout Air Flow Calculations

Goals for Step 1 Infrastructure Drawings, Layout Air Flow Calculations Specifications/Prototypes of Equipment Cabinets, Acid-Resistant Locks & Ducts, etc. Procedures Drafts Packet to D.H. by Nov 22 nd Submission to Directorate by Nov 27 th. Facility Refurbishing (Sect. 3.1). Goals

fancy
Download Presentation

Goals for Step 1 Infrastructure Drawings, Layout Air Flow Calculations

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Goals for Step 1 • Infrastructure Drawings, Layout • Air Flow Calculations • Specifications/Prototypes of Equipment • Cabinets, Acid-Resistant Locks & Ducts, etc. • Procedures Drafts • Packet to D.H. by Nov 22nd • Submission to Directorate by Nov 27th

  2. Facility Refurbishing (Sect. 3.1) Goals • (Estimate & Design to) Build air-ducts for intake of return duct to middle of lab • (..) Build air-ducts to move room supply ventilation toward middle of the room • (..) Build exhaust stack for ventilation hood Tasks and People • Design/Drafting Frank • Supervision/IB3 Experience Christian • Air-Flow Calculations Christian • Crosscheck Charlie • Material Prototype & Estimate Charlie • Work/Time Estimate Gregg

  3. New Equipment Installation (Sect. 3.2) Goals • (Estimate to) Install recently purchased chemistry Hood. • (Estimate & Proposal to) Procure chemical cabinets with spill containment and fume removal features • (Estimate & Proposal to) Lock Cabinets and Chemical Waste Disposal Area Tasks and People • Material Prototype & Estimate Charlie • Work/Time Estimate Gregg/Charlie

  4. Acid Transportation (Sect. 3.3) Goals • (Estimate to) Procure HDPE acid Carrier boxes. Tasks and People • Material Prototype & Estimate Charlie

  5. Additional Modifications (Sect. 3.4) Goals • (Est. & Design to) Enclose etching area in pseudo-enclosure. • (Estimate to) Mount panic exit-bars-only on MDTL doors. • (Est. & Design to) Install secondary containment on the floor. Tasks and People • Design/Drafting Frank • Supervision/IB3 Experience Christian • Air-Flow Calculations Christian • Crosscheck Charlie • Material Prototype & Estimate Charlie/Dave • Work/Time Estimate Gary (Panic bars) Gregg (Enclosure) Charlie (Floor) • Life Safety Aspects Rich

  6. Etching Procedures (Sect. 4.1 – 4.2) Goals (Step 1, 2 & 3 Goals are similar) • 1st Drafts of Etching & Disposal Procedures • 1st Draft of Emergency (Spill) & Medical Procedure Tasks and People • Organization/Setup/DCS Jamie • Technical Input Donna (main), Christian, Claire, Charlie, Alan • Revision/Approval Charlie • Safety Overview Rich

  7. What a Scientist/Researcher thinks of when “procedure” is mentioned !

  8. Training (Sect. 5) Goals • Finalize and Review Training Documentation Tasks and People • Training Preparation Dave Baird • Technical Review Charlie • Safety Review Rich (TD) ??? (AD)