1 / 1

2012 年政府实事工程进展情况示意图( 11 月份)

2012 年政府实事工程进展情况示意图( 11 月份). 完成年度投资计划. 图 例. 已开工或实施项目. 开展前期准备项目. 100%—. `. 90%—. 80%—. 70%—. 60%—. 50%—. 40%—. 30%—. 20%—. 10%—. 前期准备. 前期准备. 工程项目. 扩建妇儿大楼. 蔬菜配送及保供体系建设. 市区老住宅整治. 镇区建设设施改造. 办事处卫生基础设施建设. 城乡困难群众帮扶. 儿童健康保障工程. 农贸市场提档升级. 背街小巷和里弄改造. 健康礼包进万家. 新增养老床位 1000 张.

fawn
Download Presentation

2012 年政府实事工程进展情况示意图( 11 月份)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 2012年政府实事工程进展情况示意图(11月份) 完成年度投资计划 图 例 已开工或实施项目 开展前期准备项目 100%— ` 90%— 80%— 70%— 60%— 50%— 40%— 30%— 20%— 10%— 前期准备 前期准备 工程项目 扩建妇儿大楼 蔬菜配送及保供体系建设 市区老住宅整治 镇区建设设施改造 办事处卫生基础设施建设 城乡困难群众帮扶 儿童健康保障工程 农贸市场提档升级 背街小巷和里弄改造 健康礼包进万家 新增养老床位1000张 就业援助 公共租赁住房建设 公共交通运力改造 天然气应用推广 智能交通3G平台建设 青少年社会实践基地二期 特种作业人员培训基地 公交候车亭建设 民生保险优化 粮食烘干系统建设一起 气象预警信息村村通 示范实训培训基地建设 公共文化服务共享 农业基地标准化建设 城区防汛能力提升二期

More Related