110 likes | 196 Views
Bell Road Loop 101 to Grand Avenue ITS Design. Project Overview. Multi-Agency Project for the design of: 6.5 miles of Fiber Optic Cable Interconnection of 14 traffic signals 6 CCTV camera installations 4 arterial DMS installations. Traffic Signal Interconnect.
E N D
Project Overview • Multi-Agency Project for the design of: • 6.5 miles of Fiber Optic Cable • Interconnection of 14 traffic signals • 6 CCTV camera installations • 4 arterial DMS installations
Traffic Signal Interconnect • 6 City of Surprise traffic signals • 5 MCDOT traffic signals • 3 City of Peoria traffic signals • Benefit: • Remote monitoring and control of traffic signal timing • Improved progression across jurisdictions and along the corridor
Traffic Signal Coordination Considerations • Distance between intersections • Progression speed • Peak hour balancing • Trade-offs between side street delay and arterial bandwidth
CCTV Cameras • 3 City of Surprise locations Grand Avenue, R.H. Johnson Blvd, El Mirage Road • 2 MCDOT locations East of Avenue of the Arts, 99th Avenue • 1 City of Peoria location 91st Avenue • Benefit: • Remote monitoring of traffic conditions • Incident verification and management
Dynamic Message Signs • 2 City of Surprise locations East of Dysart Road and East of R.H. Johnson Boulevard • 2 City of Peoria locations East of 91st Avenue and East of 84th Avenue • Benefit: • Inform motorists of incidents, closures and special events
Future Considerations • Spare fiber for additional CCTV installations • Phase 2 ITS Design: Bell Road, Grand Avenue to Loop 303