An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. High-gradient test at Nextef Shuji Matsumoto For KEK Nextef Group 2010.5.3 44th X-band structure collaboration Meeting, CERN

  2. Contents Nextef, KEK’s X-band 100MW-class structure test stand, started its operation in 2007. Since then, we have been testing a series of CLIC prototype structures here, T18_Disk#2(2008), TD18Quad#5 (2009) and currently we run the facility for TD18_Disk#2. I am going to report on the testing of 1) TD18_Quad#5 2) TD18_Disk#2 44th X-band structure collaboration Meeting, CERN

  3. T18 parameters for 100MV/m in average gradient Riccardo info on 090202 TD18_Quad 55.5MW  100MV/m no-loaded with Tfill = 32.8ns Note we applied calibration 62.7MW input →100MV/m for TD18_Disk#2 (Faya Wang). Ep/Eacc of TD18_Quad should be similar to that of T18_Disk 44th X-band structure collaboration Meeting, CERN

  4. TD18_Quad#5 44th X-band structure collaboration Meeting, CERN

  5. High power processing and testsof TD18_Quad#5 • TD18_Quad#5 was set in a vacuum chamber and the chamber was installed in Shield-A of Nextef in Aug. 2009. • Processing and various tests were performed from Sep. to Nov. 2009. • The input power has been restricted rather soon at about 40MW due to frequent BDs in the accelerating structure. • Total RFON time is about 1000hrs. 44th X-band structure collaboration Meeting, CERN

  6. 173ns 113ns 293ns 44th X-band structure collaboration Meeting, CERN

  7. Dark current evolutionTD18_Quad#5 Nextef • Once it went up in the middle of the testing, it went down but did not back to • its initial value. • Dark current of Quad structure is larger than that of Disk at least one, probably • a few order of magnitude. (Notice that the field Eacc is about half.) 44th X-band structure collaboration Meeting, CERN

  8. Dark Current at the very final stage of the test: TD18_Quad#5 FC-UP b=76 FC-Mid b =50 44th X-band structure collaboration Meeting, CERN

  9. Vacuum characteristics • Vacuum total pressure • Base pressure at <10-6Pa • Typically processing <10-5Pa • Increases every time at few to 5MW range if after RF-OFF for more than several hours • Mass spectrum • M=2, 28 and 44 increase with RF-ON, but not M=18 • Especially when reaching power limit • M=2 becomes dominant residual gas after an hour or so run • M=27 and 28 change in a similar manner as time, indicating hydrocarbon-origin surface contamination 44th X-band structure collaboration Meeting, CERN

  10. Summary • RF on hours amounts to nearly 1000hrs. • ACC-related breakdowns counted more than 7000 times. • Power is limited by 19MW (~58MV/m) at 51 ns pulse. • Further increase of field is not expected from the trend pattern. • Long-pulse operation was tried at 113, 173 and 293nsec. • NEG application was tried to see the effect of hydrogen contents. The hydrogen pressure decreased about half but the attainable gradient did not changed(improved). • Q: Does 50microns Chamfer at the iris help to improve the high gradient performance? -> Probably NOT unfortunately. 44th X-band structure collaboration Meeting, CERN

  11. KEK’s version: 50 micron chamfer Made of CuZr without heat treatment. 50 micron rounding: shape with angles and bumps. Reference planes were formed by milling in a few micron level without re-chucking for shaping cells. Assembly was done within ten micron level. 44th X-band structure collaboration Meeting, CERN

  12. Electric field enhancement in a shallow channel with round chamfer Calculation done by T. Abe by CST MS. Waveguide field. 44th X-band structure collaboration Meeting, CERN

  13. 44th X-band structure collaboration Meeting, CERN

  14. No.18 Q2-2 to match Q1-1 Yasuo Higashi 44th X-band structure collaboration Meeting, CERN

  15. Surface inspection summary • Optical inspection with long-distance focus microscope • Still not easy to see the arcing spots • Will go to CERN SEM for full inspection 44th X-band structure collaboration Meeting, CERN

  16. Breakdown pulse analysis 44th X-band structure collaboration Meeting, CERN

  17. Timing distribution for change>2000 44th X-band structure collaboration Meeting, CERN

  18. Breakdown cell distribution >2000 50ns higher target run Mostly downstream half. Simply increasing toward output end. Indication of BD following some field gradient. 534 events were analyzed out of 1919 INTLK. 44th X-band structure collaboration Meeting, CERN

  19. TD18_Disk#2 44th X-band structure collaboration Meeting, CERN

  20. Test of TD18_Disk2 at Nextef Dec. 2009: Delivery to KEK made and installation work started. Jan. 2010: Testing of the structure started. Slow conditioning and gradient restricted (about 80MV/m). Frequent small reflection from Left-side output line were observed. Decided to replace whole left output line. Mar. 2010 Restart test with new output line. Reached 100MV/m. Operable with 60MW input (100MV/m), RF pulse width 250ns. Apr. 2010 Measurement of Breakdown rate started. We are now in the final stage of the testing. 44th X-band structure collaboration Meeting, CERN

  21. Nextef Load changed The Eacc values during 1300~1500 may not be right due to system change. (Some ADCs of data acquisition system were over-ranged .) 44th X-band structure collaboration Meeting, CERN

  22. Changing Load • Acc input power was restricted within about 40MW (but this does not look a “hard limit”), 51ns, operating time was about 1000Hr. • Frequent small reflection signals from the left –side load line are observed at most of the breakdown events. • We have decided to change the whole line in the end of Feb. • Performance of the “new” line had been checked at KT-1 previously. • The small reflections disappeared after the change. The system looks normal after the change. • We could reach to 100MV/m gradient as well as we could increase the pulse width. • The “bad” line was tested at KT-1, but the behavior observed in Nextef did not reproduce. 44th X-band structure collaboration Meeting, CERN

  23. BDR evaluation planTD18_Disk#2 Nextef 44th X-band structure collaboration Meeting, CERN

  24. TD18_Disk_#2 Breakdown rate 44th X-band structure collaboration Meeting, CERN

  25. BDR Pulse Width Dependence/NLCTA TD18_Disk 10^-3 Faya Wang Nextef 250ns 100MV/m BDR=7e-7 (250ns,100MV/m) for T18 at Nextef Nextef 90ns 100MV/m 10^-6 Our data looks consistent nicely with NLCTA one. 44th X-band structure collaboration Meeting, CERN

  26. Breakdown rate measurement252nsCheck statistic of the data Run 37 (50MW) 12 BD’s BDR [10^-6 /pulse/m] Run 34 (60MW) 80 BD’s BDR [10^-6 /pulse/m] Run 35+36 (55MW) 41 BD’s BDR [10^-6 /pulse/m] Instant BDR(10^-6) Elapsed time (Hour) It is naturally expected to be converged to the “final” BDR value, and actually we see this behavior. 44th X-band structure collaboration Meeting, CERN

  27. Timing statistics for Rs rise and Tr fall Rs: 100—350ns for 252nsec pulse Most of Rs change sit around 360+-50nsec Tr: 150—400ns for 252nsec pulse Most frequent when approaching to the end, from 300 to 370ns. There is a small bump at 170 nsec, at the beginning of pulse. 44th X-band structure collaboration Meeting, CERN

  28. Search for the hot cells: identification of the breakdown location 44th X-band structure collaboration Meeting, CERN

  29. Some pulse: Run34 #38 and #39 Rs Ra Tr F This case was not analyzed reasonably. FC-UP FC-Mid I_Rs Q_Rs Mostly analyzed well as these events. Difficulty in automatic analysis is remaining! Should be revised! 44th X-band structure collaboration Meeting, CERN

  30. FC-Mid 51nsRF 44th X-band structure collaboration Meeting, CERN

  31. FN Plot 44th X-band structure collaboration Meeting, CERN

  32. FN Beta History: FC-Mid T18@Nextef Beta=38 1950hrs 44th X-band structure collaboration Meeting, CERN

  33. UP Mid DN Still going up 44th X-band structure collaboration Meeting, CERN

  34. Summaryof TD18_Disk#2 testing • Finally it reached over than 100MV/m at 50ns width • But it took much more hours and breakdowns than T18, 5000 BD’s and 1300 hours • Widening pulse was easily established at 100MV/m level • With only 1000 BD’s and 200 hours • Dark current was initially reduced but recently has been saturated. • Breakdown rates were and is being measured. It is 10-4/pulse/m at 100MV/m at 252nsec. • Pulse shape analysis and phase information are still to be developed. 44th X-band structure collaboration Meeting, CERN

  35. Conclusions 44th X-band structure collaboration Meeting, CERN

  36. Conclusions: TD18_Quad#5 • TD18Quad#5 test was done. • Attained gradient was as low as some 60MV/m with short pulse width 51ns. • Remarkable outgas activity was seen during the operation. Base pressure of the structure chamber was 10^-6Pa . • Large amount of dark current observed. The beta value of FN plots (for FC-Mid, beta=50) is slightly larger than that of TD18Disk (now about 40). • Follow-up works, such as SEM observations on the surface of the structure, are ongoing. 44th X-band structure collaboration Meeting, CERN

  37. Conclusions: TD18_Disk#2 • Testing of TD18_Disk#2 structure is at its final stage. • 100MV/m with 250ns has been reached. • BDR has been measured and the values agree with NLCTA data. (Although it looks still decreasing) it may be fair to conclude that BDR of TD18_Disk#2 is greater than that of T18 by about two order of magnitude. • The amount of dark current has been decreasing by a few order of magnitude during the test (over some 2000hrs) and became very similar to that of T18. • The field enhancement factor, beta, has decreased by factor of 2. The final value is some 40. 44th X-band structure collaboration Meeting, CERN