1 / 3

Iowa Test Plans for ESTB

Iowa Test Plans for ESTB. B. Bilki, Y. Onel University Of Iowa. Digital Hadron Calorimeter (DHCAL) Tests Development of low-resistivity glass is underway in collaboration with the COE College, Cedar Rapids, Iowa . Might need to test RPCs with different glass samples in beam.

fergus
Download Presentation

Iowa Test Plans for ESTB

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Iowa Test Plans for ESTB B. Bilki, Y. Onel University Of Iowa

  2. Digital Hadron Calorimeter (DHCAL) Tests • Development of low-resistivity glass is underway in collaboration with the COE College, Cedar Rapids, Iowa. • Might need to test RPCs with different glass samples in beam. • Variable particle rate over 50 – 2000 Hz/cm2 is needed. • Secondary Emission (SE) Calorimetry Tests • In an SE detector module, secondary electrons are generated from an SE cathode when charged hadron or electromagnetic shower particles penetrate the SE sampling module placed between absorber materials in calorimeters. • A prototype SE module is being built with alternating layers of multianode PMT arrays and steel absorbers (first stage involves testing a single layer with an absorber of variable thickness). • Dual Readout/Crystal Calorimetry • Different crystal samples with different readouts. • Test for the time and spatial development of scintillation and Čerenkov light. • Readout with SiPMs and PMTs directly coupled to the crystals. • Test for different crystal properties (surface finish, wrapping, etc.) • Precise beam position measurement is needed (wire chambers, etc.)

  3. Parameters required for Beam Tests

More Related