1 / 8

End Station A Test Beam (ESTB)

End Station A Test Beam (ESTB). Proposals, Procedures, Schedule. Carsten Hast and Mauro Pivi August 23 th 2012. ESTB Proposals Submission and Review Process. ESTB Scientific Committee (SC) Appointed by SLAC Management (PPA-ALD) Evaluates and prioritizes proposals

zofia
Download Presentation

End Station A Test Beam (ESTB)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. End Station A Test Beam (ESTB) • Proposals, Procedures, Schedule Carsten Hast and Mauro Pivi August 23th 2012

  2. ESTB Proposals Submission and Review Process • ESTB Scientific Committee (SC) • Appointed by SLAC Management (PPA-ALD) • Evaluates and prioritizes proposals • There are two fundamentally different types of experiments which can be conducted at ESTB: • Accelerator physics experiments like machine detector interface, linear collider beam delivery studies • Detector R&D experiments including radiation tests • The ESTB Scientific Committee will direct accelerator physics experiments to be reviewed by SAREC (SLAC Accelerator Research Experimental Program Committee) • All other proposals will be reviewed directly by ESTB SC

  3. ESTB Proposals Submission and Review Process • For detector R&D or radiation tests user submits a comprehensive proposal which includes: • PI, members and institutions involved • Short description of the overall physics goals • Detailed description of the experimental apparatus • Sketch of the planned layout with dimensions • Description of the DAQ system coming with the experiment and what additional DAQ will be needed from SLAC • Other electronics components (HV supplies, scopes, etc.) • Cooling or gas supply needs • Computing infrastructure needs • Any other aspect which might be of importance • Support needed from SLAC: riggers, technicians, DAQ systems, cooling, gas lines, etc. • Preferred beam parameters and acceptable beam parameters • Estimated installation time • Run plan (e.g. how many data points, how many modifications of the apparatus, etc.) • Preferred running time • Any other aspects of importance

  4. ESTB Proposals Submission and Review Process • Proposal (2-5 pages) is submitted to C. Hast (hast@slac.stanford.edu) • Proposal is reviewed by ESTB Scientific Committee • C. Field, P. Grenier, C. Hast, B. Ratcliff + additional members (as needed) • Accelerator physics proposal are send to SAREC for review • Criteria for proposal evaluation: • scientific value • feasibility • evaluation of resources • scheduling and prioritization • SAREC will provide a prioritized list of their reviewed proposals to ESTB SC • Proposal will be reviewed by SLAC Safety Committees as appropriate (ESTB Operations Manager directs this process) • Electrical • Earthquake • Hazardous Experimental Equipment Committee • Radiation Physics • etc. • ESTB Scientific Committee will provide a prioritized list of experiments to the ESTB Operations Manager who will schedule the experiments • Typical turn around for detector R&D proposals between 1 and 3 months

  5. ESTB Proposals Submission and Review Process • The ESTB Scientific Committee will direct accelerator physics experiments to be reviewed by SAREC (SLAC Accelerator Research Experimental Program Committee) • SAREC has a similar but more elaborated review process • https://slacportal.slac.stanford.edu/sites/ard_public/facet/sarec/Pages/default.aspx • SAREC’s main task is to review FACET proposal. This process is documented here: • https://slacportal.slac.stanford.edu/sites/ard_public/facet/user/Pages/default.aspx • https://slacportal.slac.stanford.edu/sites/ard_public/facet/Documents/Proposals%20%28New%20Experiments%29.pdf • SAREC meets once per year, but proposals can be submitted at any time • Next SAREC meeting October 11/12, 2012

  6. ESTB Proposals Submission and Review Process User Proposal ESTB SC Review ESTB Operations Schedules Experiments ESTB SC Prioritization SAREC Review

  7. After Your Proposal is Accepted • Any experimental setup needs review and approval to be installed and operated at SLAC • Safety Oversight Committee (SOC) • Looks at experimental equipment and will request Safety Officers and others to review your setup • Test Facilities (TF) is instrumental in getting the necessary approvals for you • We know how the system works • We are part of the system • We can do many things for you – If you tell us what you want to do • This process can be quite fast for “normal” setups • But if you need “more exotic” components (e.g. hazardous gases) will take more time • Electrical components need to be UL listed (or equivalent) • That’s a tough one, because many devices you are using in your home institutes are not! • A European “CE” is not good enough at SLAC • SLAC has an inspection process to approve non listed devices • TF can do that • We will only allow the operation of approved devices • Radioactive sources need to be registered with RP prior to their arrival

  8. Becoming a User • Users will register with the SLAC Users Organization • SLUO http://www-group.slac.stanford.edu/sluo/ • SLUO will work with the PI on a generic MoU between Stanford University and your home institution (mainly about intellectual property rights…) • Each individual user needs to agree to that MoU • SLUO will get users a SLAC systems ID and a computer account • We might change to the SSRL/LCLS style user organization, but that will be transparent to ESTB users • A SLAC Contact will be assigned to each experiment and user • This SLAC Contact functions as your supervisor here at SLAC • Carsten Hast will be the Operations Manager for ESTB in FY13 • SLAC Contact defines the training requirements • Most training can be done remotely via web training (after you have a SLAC system ID) • Couple of things on first day of arrival • We will setup a web page which will lay out what you need to do

More Related