1 / 7

Union Pacific Wind Program

Union Pacific Wind Program . October 27, 2009. Farm. String. Nacelle. Hub. Blades. Tower Base section. Tower mid Section. Tower upper section. DtA = Down Tower Assembly. Wind Energy Supply Chain. 1. Port or Plant. 2. 4. 3. UPDS Rail DC. Rail. 6. 5. PAD.

fergus
Download Presentation

Union Pacific Wind Program

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Union Pacific Wind Program October 27, 2009

  2. Farm String Nacelle Hub Blades Tower Base section Tower mid Section Tower upper section DtA = Down Tower Assembly Wind Energy Supply Chain 1 Port or Plant 2 4 3 UPDS Rail DC Rail 6 5 PAD Carriers

  3. Wind – Rail Clearances 14’ 2” + width & Turns

  4. UPDS WIND Distribution Centers • Current Operating DC’s • --Abilene, TX • -- Boardman, OR • -- Manly, IA • --Carr, CO • -- Tucson, AZ • -- Devils Lake, ND • -- Liberal, KS • -- Mojave, CA • -- Colton, CA • Pre-qualified DC Sites • --Bloomington, IL • -- Peoria, IL • -- Indio, CA • -- Kanopolis, KS • -- Butte, MT • -- El Reno, OK • -- Arlington, OR • -- Miller, SD • -- Milford, UT • -- Egbert, WY • -- Sidney, NE • -- Montevideo, MN • -- Milwaukee, WI Top States in Wind Production States with significant growth potential

  5. Manly, Iowa

  6. Short Line - Universal Tower Fixtures

  7. Short Line – Universal Blade Fixtures

More Related