Duke Energy Carolinas Quarterly Stakeholder Meeting. 4 th Quarter 2011. Independent Entity Services Thursday, January 19, 2012 2:00 to 4:00 p.m. EST. Agenda. Action Items & Follow Up from September 15, 2011 Business Practices - Pending Change to 3.F. Preempting Requests
E N D
Duke Energy CarolinasQuarterly Stakeholder Meeting • 4th Quarter 2011 Independent Entity Services Thursday, January 19, 2012 2:00 to 4:00 p.m. EST
Agenda • Action Items & Follow Up from September 15, 2011 • Business Practices - Pending Change to 3.F. Preempting Requests • NAESB Update - Wholesale Electric Quadrant • ATC Training • Wrap-up
Action Items & Follow-up from September 15, 2011 • September 15, 2011 meeting • Duke was asked: • Consider posting a five year forecast of transmission rates.
Business Practice - Pending Change to 3.F. Preempting Requests • 3.F includes the process of Preemption and Right of First Refusal • Duke will deploy an OATI tool, Preemption & Competition Module or PCM. PCM will semi-automate Preemption and Right of First Refusal. • Business Practice 3.F will be modified to outline the PCM process of Preemption and Right of First Refusal when ATC/AFC is limited. • Challenging Requests must be preconfirmed and not profiled • Pending Requests have no ROFR and will be superseded to accommodate the Challenging Request • Existing Reservations not eligible for ROFR will be recalled to accommodate a higher priority Challenger • Existing Request eligible for ROFR • Capacity to accommodate the Challenger will be recalled from the reservation with ROFR • A MATCHING request will be automatically generated with a status of COUNTEROFFER in place of the reservation with ROFR • The MATCHING request must be confirmed within the response time to retain capacity • Rebids of MATCHING requests will not be accepted • If the MATCHING request is confirmed, the Challenger will be Counteroffered or Refused and the balance remaining will be recalled from the Existing request with ROFR • Customers who opt not to challenge and do not want the remaining capacity may ask for full displacement of the original reservation
Preemption and Right of First Refusal Customer Notification • When the ATC Validation Criteria detects a deficiency in ATC/AFC, Preemption and Competition Module (PCM) will perform an assessment as to the feasibility of entering into a Preemption and/or Competition scenario to grant service to the new request. • Notifications for Preemption • If PCM determines service requests or reservations should be Preempted a RECALL or SUPERSEDE of the existing service will be created by PCM. • OASIS Notification • Existing reservation will be recalled by the amount need to accept the Challenging request • The AREF of the Challenging request will be indicated in Seller Comments when a RECALL or SUPERSEDE is created • E-mail notification of “transstatus” change will be sent to the person who created the existing request • Subject: XXXXXXXX RECALL transstatus • User must have Notification Method enabled and a Notification Address on their User Preferences
Preemption and Right of First Refusal Customer Notification • Notifications for Competition • If PCM determines service requests or reservations should be placed into Competition, a RECALL of the existing service and a MATCHING request will be created by PCM. • OASIS Notification • New TSR will be created with a Status of COUNTEROFFER and request type MATCHING in the amount and time span calculated • Match MW is determined by the MWs need to accommodate the Challenging request • Seller Comments will indicate the AREF of the Challenging request • Existing reservation will be recalled by the amount need to accept the Challenging request • RECALL TSR text in Seller Comments will indicate the AREF of the Challengingrequest • If the MATCHING TSR is Confirmed a RECALL will be issued for the balance of the Defender • RECALL TSR text in Seller Comments will indicate the AREF of the MATCHING request for ROFR • E-mail notification of “transstatus” change will be sent to the person who created the existing request • Subject: XXXXXXXX RECALL transstatus • User must have Notification Method enabled and a Notification Address on their User Preferences
NAESB Update Wholesale Electric Quadrant • 2012 Annual Plans • Link to Wholesale Electric Quadrant Annual Plan • Link to Wholesale Gas Quadrant Annual Plan • Link to Retail Annual Plan • Network Service on OASIS (NITS)(OASIS Subcommittee) • Recommendation Completed by Subcommittee on Dec 1, 2011 – link • Formal Industry Comment Period Until Feb 27, 2012 – link • Review Session for Industry – Jan 24, 2012 - link • EC Single-Topic Meeting for Vote - to be Scheduled • File with FERC -- 2nd Quarter 2012 • Preemption and Right of First Refusal(OASIS Subcommittee) • Work begins on Jan 25th
NAESB Update Wholesale Electric Quadrant • Electric Industry Registry (EIR) (NAESB Office/JESS) • Transfers TSIN Registry from NERC to NAESB • OATI will administer for NAESB • Data will need to be registered again – not moving TSIN data to EIR • Annual registration fee will be required • RFP and System Specification Document - link • Frequently Asked Questions - link • EIR Calendar – link • Testing and Approval of EIR – End of January – link to Test Plan • Training planned for Feb & Mar 2012 • Should be operational in 2nd Qtr 2012
NAESB Update Wholesale Electric Quadrant • Parallel Flow Visualization for Eastern Interconnect(Business Practices Subcommittee) • The WEQ Executive Committee approved the recommendation for the interim solution on 10/26/2010 (approved recommendation) • The BPS is working on a permanent solution: • Hybrid Option • Tag all Non-Firm transactions within a BA • Require upload of firmness of transmission service for each running generator every 15 minutes (Generator Prioritization) • BPS is considering a two-tiered firm curtailment process (first-to-cut / last-to-cut) • Policy Change issue has been addressed • Will require coordination agreements between BAs for loop flows to be granted first-to-cut priority
NAESB Update Wholesale Electric Quadrant • FERC Order 1000 • Task Force established to review Order 1000 to determine what, if any, actions should be undertaken by NAESB WEQ • FERC Order 1000 Matrix - link • FERC Order 1000 Summary – link • Provisional Item 19 Added to 2012 WEQ Annual Plan • PKI (Public Key Infrastructure) Subcommittee • New Subcommittee – link to subcommittee’s web page • Responsible for Proposing Modifications to or Developing New WEQ-012 PKI Standards
ATC Training • Due to the size and detail of this presentation, it will be presented from a separate document. • The ATC Training presentation can be found on the Duke OASIS Homepage under Documents > Stakeholder Meetings > Q4 20120119 - ATC Training Presentation
Wrap-up Proposed Next Quarterly Stakeholder Meeting • Thursday, March 22, 2012 – 2 p.m. to 3 p.m. ET Customer Suggested Topics? • This is the forum for discussing emergent topics (Upcoming changes, stakeholder input) Questions and Comments