An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Expeditionary Warfare Division -OPNAV N85- Update Colonel Brian McGovern Branch Head, Seabasing Integration (N85V)

  2. Expeditionary Warfare Division RDML(s) Kevin Scott, USN • Branches: • NAVAL SPECIAL WARFARE BRANCH (N851) • CAPT Robert Wilson, USN • MINE WARFARE BRANCH (N852) • CAPT Mark Rios, USN • AMPHIBIOUS WARFARE BRANCH (N853) • CAPT Ed Barfield, USN • NAVY EXPEDITIONARY COMBAT COMMAND BRANCH (N857) • CAPT Barry Coceano, USN • SEABASING BRANCH (N85V) • Col Brian McGovern, USMC Power Projection United Kingdom 8

  3. MPF(F) • JAN – APR 2010 Test Article Vehicle Transfer System (TAVTS) test and evaluation • Demo to validate dynamic positioning (DP) operations and ship to ship vehicle transfers in sea state three. • The full scale TAVTS and portable thrusters and power units have been fabricated and shipped to Corpus Christi TX for installation on the Mighty Servant 3 (leased FLO-FLO) • Test will run approximately 45 days • Program Priorities • Successful MLP Systems Design Contract Execution • JROC Approval of MPF(F) Increment Three CDD • Successful MPF(F) Vehicle Transfer At-Sea Demo in 2nd QTR FY10 Prepositions a Brigade’s equipment set and sustainment - Provides a Scalable, Rapid Response Capability and facilitates assured access from the sea in restricted-access environments MPF(F) Program is under review in QDR and PR 11

  4. Joint High Speed Vessels (JSHV) • JHSV provides the ability to transport combat ready units rapidly over intra-theater distances without reliance on shore based infrastructure and in austere environments. • Intra-Theater Littoral Maneuver • Seabasing Support • PB 10 procurement: 18 ships – 5 Army, 13 Navy

  5. Ship to Shore Connector (SSC) • LCAC craft inventory (including SLEP) falls below requirement in 2014 • Number of craft yet to be determined; Anticipate minimum 72(+) SSC required to support 3 MEBs • Milestone A achieved in May 2009 • Draft formal requirements (CDD) and Key Performance Parameters in staffing with Navy, approval planned for early Oct 2009 for entry into JCIDS

  6. LCAC SLEP • Preserves amphibious warfare triad (LCAC / EFV(AAAV)/MV-22) • Allows execution of Operational Maneuver From The Sea (OMFTS) and Ship to Objective Maneuver (STOM) • Defers requirement to fund next generation LCAC from FY00 to FY10 • Challenges: • COTS obsolescence, Technology Insertion • Growth work increasing due to the degraded condition of the craft entering SLEP availabilities AUG 09: 24 of 72 SLEPs complete

  7. LHA(R) • Provide the functional replacement for the LHA 1 Class Ships • LHA 6 is a modified LHD variant • Delivery of LHA 6 is being extended from August 2012 to April 2013. • LHA 7 was changed from MPF(F) ship to Assault Echelon (AE) ship • Program Challenges: • Navy/Marine Corps Requirements for future LHA(R) platforms… LHA 8 well deck feasibility study

  8. LPD 17-21 Delivered LPD 22-25 Under Construction LPD 17 • Functionally replaces LPD 4, LSD 36, LKA 113, and LST 1179 Ship classes • LPD Program Profile: • First 5 ships delivered and commissioned • 4 ships under construction in New Orleans & Pascagoula • FY09 Def Approp Act included FY09 funding for part of the 10th LPD 17 class ship. • LPDs 17 and 18 have completed initial deployments NOT UNDER CONTRACT FY 12 11/16

  9. LSD MID LIFE • Mid Life Program, not a SLEP • Return ships to capable Fleet Asset status; able to meet amphibious mission requirements through 2038 • Objective is to: • Improve declining material condition and readiness, • Replace obsolete equipment and • Reduce total ownership costs through technology insertion • Whidbey Island Class (LSD 41 - 48) Harpers Ferry Class (LSD 49 - 52)

  10. Questions?