80 likes | 549 Views
Automated Assembly Facility. Tinisha McMillion ET-493 Fall 2013 Advisor: Dr. Roy Bonnette. OVERVIEW. Industrial Concentration. Continuous improvements concentrated on process design and efficiency. Automated Assembly of DELL model M-UVDEL1 Mouse. Process Design. Automated Systems Layout.
E N D
Automated Assembly Facility Tinisha McMillion ET-493 Fall 2013 Advisor: Dr. Roy Bonnette
OVERVIEW • Industrial Concentration. • Continuous improvements concentrated on process design and efficiency. • Automated Assembly of DELL model M-UVDEL1 Mouse. • Process Design. • Automated Systems Layout. • 3-D Modeling of Mouse Components. • Required Automation. • Facility Design and Layout.
SPECIFICS • Process Design. • Automated Systems Layout. • Facility Design Layout. • Automation Design/Layout. • Transportation System. • Robotic Stations. • Parts Staging. • Inspection Stations. • 3-D Modeling. • Individual Mouse Components. • Robotic End Effectors. • Mouse Cradle.
OBSTACLES • Process Design and Systems Layout are Critical. • Functionality of Available Equipment for Testing.
TIMELINE • Fall 2013 • Process Design – expected 11/1/13. • Automation Systems Layout – expected 11/22/13. • 3-D Modeling. • Spring 2014 • Completion of Automation Systems Layout – expected 12/13/13 • Completion of 3-D Modeling – expected 3/14/14. • Facility Design and Layout – expected 4/25/14.
RESOURCES • Dr. Roy Bonnette • James Stutts • Jonathan Newsom