Automated Assembly Facility. Tinisha McMillion ET-493 Fall 2013 Advisor: Dr. Roy Bonnette Instructor: Dr. Cris Koutsougeras. OVERVIEW. Design an Automated Assembly for DELL model M-UVDEL1 Mouse. Process Design. Line Processes. Automation and Transportation Systems.

keagan
Download Presentation

Automated Assembly Facility

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Automated Assembly Facility Tinisha McMillion ET-493 Fall 2013 Advisor: Dr. Roy Bonnette Instructor: Dr. Cris Koutsougeras

  2. OVERVIEW • Design an Automated Assembly for DELL model M-UVDEL1 Mouse. • Process Design. • Line Processes. • Automation and Transportation Systems. • Automated Systems Layout. • 3-D Modeling of Mouse Components. • Facility Design and Layout.

  3. SPECIFICS • Process Design. • Disassemble Mouse. • Record Placement and order of assembly. • Line Processes. • Components for each line determined. • Permanent Attachment Method Determined. • Automation and Transportation. • Conveyor System researched and selected. • Robotics being researched.

  4. Automated Systems Layout • Size and Space Requirements. • Speed Capabilities. • Programmable axles. • 3-D Modeling. • Individual Mouse Components. • Facility Design and Layout. • Size and Orientation.

  5. High Level Process

  6. Board Assembly Line

  7. Bottom Cover Assembly Line

  8. Top Cover Assembly Line and Final Assembly Process

  9. Open Issues • Automation. • Research is underway. • Automated Systems Layout. • To be completed after automation is selected. • 3-D Modeling. • Modeling is underway. • Facility Design and Layout. • To be completed after automation is selected and final automated systems layout determined.

  10. TIMELINE • Fall 2013 • Process Design – expected 11/1/13. • Line Processes – expected 11/22/13. • 3-D Modeling. • Spring 2014 • Completion of Automation Systems Layout – expected 12/13/13 • Completion of 3-D Modeling – expected 3/14/14. • Facility Design and Layout – expected 4/25/14.

  11. RESOURCES • Dr. Roy Bonnette • James Stutts • Jonathan Newsom

  12. References • Dorner Mfg. Corp.

  13. Questions?