An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Distributed 2-stage RTBC LH2 Pipeline Cryocooler System Design LEI ZHOU MMAE UCF

  2. Basic features of LH2 Cryocooler • For prechilling/cooling of the transportation pipeline of liquid Hydrogen • Capable of removing heat at 19K • Distributed mid-size cryocoolers are the best solution for the long LH2 pipeline

  3. Distributed RTBC cryocooler • Reverse Turbo-Brayton cryocooler has higher efficiency than JT cryocooler • With oil-free design, Turbo-compressor/expander has high reliability • Distributed mid-size cryocoolers can be • Easy installable and manageable • Expandable • Redundant • Efficient

  4. Cryocooler cooling power analysis How much heat should be removed? How much cooling power needed to chill down a 50-ft-long-pipe in 24 hours The Invar LH2 pipeline should be chilled down from 310K to 19K. Size: 10-inch diameter D, 8 mm pipe wall thickness th (estimated) Q=1908 kJ /ft P=Q*50/24*3600=1104W

  5. 2-stage RTBC: — a way to reduce chilling time • Chill down with top cycle to 80K • Switch the top cycle flow to cool the bottom cycle, use bottom cycle to chill down to 19K • Total time: 7.4 hr • Chill down with the both stages simultaneously to 19K • Total time: 24.2 hr

  6. Top cycle Flow switch Inter-heat exchanger / bottom cycle Cooling load interface 2-stage RTBC cryocooler

  7. Top cycle Flow switch Inter-heat exchanger / bottom cycle Cooling load interface 2-stage RTBC cryocooler:—working mode1 CLI temperature: 80K Cooling power: 9.95 kW ; Cooling time: 2.2 hr

  8. Top cycle Flow switch Inter-heat exchanger / bottom cycle Cooling load interface 2-stage RTBC cryocooler:—working mode2 CLI temperature: 19K Cooling power: 1.1 kW ; Cooling time: 5.2 hr

  9. Qrej Qrej Turboalternator Intercooler DC Reg-ulator/ Power Supply DC Power Supply External HX Recuperator Motor/ 2 Stage intercooled compressor Motor/ 2 Stage intercooled compressor Recuperator Turbo expander/brake Load Interface System configuration

  10. Thermodynamical schematic design

  11. System Optimization • System requirements: • Cooling temperature: 19K • Cooling power: 1100 W • Working temperature: 310 K • Optimizable parameters: • Bottom Cycle pressure ratio: Pr

  12. Ti=80K COP vs. Pr

  13. Spec. of Components • Top cycle: • Compressor: centrifugal 2-stage intercooled, Pr=2.42 • Motor: 85 kW, efficiency>=0.85 • Heat regenerator: 0.987 effectiveness, 121 kW • Turbine: turbo-expander with generator, 11.2 kW • Bottom cycle: • Compressor: centrifugal 2-stage intercooled, Pr=3 • Motor: 15 kW, efficiency>=0.85 • Heat regenerator: 0.96 effectiveness, 11.7 kW • Turbine: turbo-expander with gas brake, 1.5 kW

  14. Conclusions • With system optimization, the proposed system can have a COP around 0.01 W/W • Cooling power analysis shows that the cryocooler system is a mid-size system which is capable of chill down a 50-ft transfer line to 19K in about 8 hours