1 / 1

TEAM BRIGHTRIDERS PROJECT SPECIFIC SUCCESS CRITERIA

TEAM BRIGHTRIDERS PROJECT SPECIFIC SUCCESS CRITERIA. Ability to receive and store motor status data from the motor controller via RS232. Ability to receive and store battery status data from the battery protection system via RS232.

franz
Download Presentation

TEAM BRIGHTRIDERS PROJECT SPECIFIC SUCCESS CRITERIA

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TEAM BRIGHTRIDERSPROJECT SPECIFIC SUCCESS CRITERIA Ability to receive and store motor status data from the motor controller via RS232. Ability to receive and store battery status data from the battery protection system via RS232. Ability to receive, store, and transmit data to and from CAN nodes on the CANbus, as well as act as a master for the CAN system. Ability to read and store data retrieved from on-board sensors, including the 3D-accelerometer and temperature sensor. Ability to send stored data through the packet modem linked with the chase vehicle, both automatically and upon request.

More Related