An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Updates of the APGrid PMA OGF25 @ Catania March 3, 2009 Yoshio Tanaka APGridPMA Chair, AIST, Japan

  2. Some updates since Lisbon meeting • IGCA was approved as an IGTF Classic AP compliant CA. (Nov. 05, 2008). • Included in IGTF CA Distribution 1.26 (Dec. 14). • NGO/Netrust CA was temporary dropped off from the IGTF CA distribution. (1.26) • They need more time to re-configure the CA system to extend the lifetime of CRL to three days. • Started the review of HKU Grid CA (Jan. 2009) • CNIC and IGCA are primary reviewers. • Had a VTC (Jan. 17) • All members attended. • Agenda • Updates from member Cas • Discussions on how to implement sustainable review & external auditing • Venue of the next F2F meeting • ASGC issued a new root CA certificate. • Changed signature algorithm from MD5 to SHA1

  3. Members (15 + 3) • 13 Accredited CAs • AIST (JP) • APAC (AU) • ASGCC (TW) • CNIC (CN) • IGCA (IN) • IHEP (CN) • KEK (JP) • KISTI (KR) • NAREGI (JP) • NCHC (TW) • NECTEC (TH) • NGO/Netrust (SG) • PRAGMA-UCSD (US) • 1 CAs under review • U. Hong Kong (HK) • Planning • ThaiGrid (TH) • General membership • Osaka U. (JP) • U. Hyderabad (IN) • USM (MY)

  4. ASGCCA Report Jinny Chien March 1 2009

  5. Event • Time : 9:00 Feb-25-2009 UTC • Event distribution : because of unexpected accident on the part of data center at ASGC, all on-line services were shut down including ASGCCA web server. • Effect : ASGCCA certificate activities were down. CRL did not publish in time.

  6. Process • 9:00 Feb 25 UTC : Sent an EGEE broadcast to all ROC managers, VO managers, WLCG users, APGridPMA members, ASGCCA users • 2:00 Feb 26 UTC : Sent an announcement to IGTF-RAT and IGTF-general lists. Try to recovery ASGCCA web page • 12:00 Feb 26 UTC: Moved ASGCCA web to the safe place and connected to the Internet. • 16:00 Feb 26 UTC : ASGCCA web site was up. Sent the announcement to IGTF-RAT, IGTF-general and ASGCCA user lists

  7. Summary • Feb-25-2009 UTC ASGCCA web was down and sent an announcement to APGridPMA, ASGCCA users, IGTF-RAT, IGTF-general • Feb 26 UTC : Recovered and ASGCCA web site was up. Sent the final announcement and checked all CA activities well. • Total process is two days

  8. Next F2F meeting • Taipei, Taiwan, in conjunction with ISGC 2009. • Date: April 20th (Monday) • Venue: Academia Sinica, Taiwan • Grid Security Workshop (training) on Sunday, April 19th. • Security and Networking Sessions in the main symposium • More information: • http://www.twgrid.org/isgc/