1 / 16

Updates of the APGrid PMA

Updates of the APGrid PMA. Yoshio Tanaka APGrid PMA, Chair Grid Technology Research Center, AIST, Japan. APGridPMA: Members. Geographical locations (except US and AU). APGrid CAs (accredited, 1/3). Australia APACGrid CA Accredited in Nov. 2005 Started the operation in Feb. 2006

leda
Download Presentation

Updates of the APGrid PMA

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Updates of the APGrid PMA Yoshio Tanaka APGrid PMA, Chair Grid Technology Research Center, AIST, Japan

  2. APGridPMA: Members

  3. Geographical locations (except US and AU)

  4. APGrid CAs (accredited, 1/3) • Australia • APACGrid CA • Accredited in Nov. 2005 • Started the operation in Feb. 2006 • Audited in March 2006 • David Bannon, Graham Jenkins, Chris Kendrick • Issues certificates for LCG • China • IHEP CA • Accredited in May 2005 (already in operation) • Audited in December 2005 • profile of the root cert. has been changed • Gongxing Sun, Gang Chen, Fan HuaXiang • Issues certificates for LCG • CNIC / SDG CA • Accredited in Dec. 2005. • Not yet in operation • Going to launch a new CA • hierarchical CA • need to be accredited again • Kai Nan, Morrise Xu,

  5. APGrid CAs (accredited, 2/3) • Japan • AIST GRID CA • Accredited in Sep. 2004 • Started the operation in March 2005 • Audited in March 2005 • Yoshio Tanaka, + 5 staffs • NAREGI CA • Accredited in Nov. 2005 • Started the operation in Feb. 2006 • Not yet audited • Currently, removed from IGTF CA distribution • Masataka Kanamori, + 4 staffs • KEK Grid CA • Accredited in Jan. 2006 • Started the operation in Feb. 2006 • Not yet audited • Takashi Sasaki, + 2~3 staffs • Issues certificates for LCG

  6. APGrid CAs (accredited, 3/3) • Korea • KISTI GRID CA • Accredited in Aug. 2004. (already in operation) • Not yet audited • Sangwan Kim, Jae-hyuck Kwak • Issues certificates for LCG • Taiwan • ASGCC CA • Operated by Academia Sinica Grid Computing Center • Accredited in Sep. 2004. (already in operation) • Audited in Aug. 2005 • Eric Yen, C.C. Chang, + 1~2 operators • Issues certificates for LCG • NCHC Grid CA • Operated by National Cener for High-performance Computing • Accredited in Feb. 2006 • Not yet in operation • Alex Wu, Weicheng Huang, + 1~2 operators

  7. APGrid CAs (under review, planned) • Singapore • NGO CA • will be operated by National Grid Office and Netrust Inc. • CP/CPS under review • will issue certificates for LCG • Thailand • NECTEC CA • will be operated by National Electronics and Computer Technology Center • drafting CP/CPS • Thai National Grid Center • will be operated by Thai National Grid Center • drafting CP/CPS • USA • PRAGMA CA • will be operated by SDSC • planning to be a catch-all CA for PRAGMA members • drafting CP/CPS

  8. APGrid CAs (general membership) • China • Univ. of Hong Kong • India • Univ. of Hyderabad • Japan • Osaka Univ. • Malaysia • Univ. Sains Malaysia

  9. Grid Communities in Asia Pacific – at a glance – • ApGrid: Asia Pacific Partnership for Grid Computing • Open Community as a focal point • more than 40 member institutions from 15 economics • Kick-off meeting: July 2000, 1st workshop: Sep. 2001 • PRAGMA: Pacific Rim Applications and Grid Middleware Assembly • NSF funded project led by UCSD/SDSC • 30 member institutions • Establish sustained collaborations and advance the use of the grid technologies • 1st workshop: Mar. 2002, 10th workshop: next month! • APAN (Asia Pacific Advanced Network) Grid Committee • Bridging APAN application communities and Grid communities outside of APAN • Grid WG was launched in 2002, re-organized as a committee in 2005 • APGrid PMA: Asia Pacific Grid Policy Management Authority • General Policy Management Authority in the Asia Pacific Region • 16 member CAs • A founding member of the IGTF (International Grid Trust Federation) • Officially started in June 2004 • APEC/TEL APGrid • Building social framework • Semi-annual workshops • APAN (Asia Pacific Advanced Network) Middleware WG • Share experiences on middleware. • Recent topics include ID management and National Middleware Efforts. • Approved in January 2006.

  10. Pacific Rim Application and Grid Middleware Assembly • NSF-funded project lead by UCSD/SDSC. • 1st workshop was held in March 2002. • Establish sustained collaborations and advance the use of the Grid technologies for applications. • Expected outcomes: • Advance scientific applications • Increase productive and effective use of the grid by researchers and scientists in the Pacific Rim • Increase interoperability of grid middleware in Pacific Rim and throughout the world Tightly collaborating with ApGrid. Having workshops 2~3 times a year.

  11. PRAGMA && TAGPMA • Chille • CICESE (Centro de Investigacion Cientifica y de Education Superior de Ensenada) • Mexico • UNAM (Universidad Nacional Autonoma de Mexico) • As of today, UNAM is not an institutional member • USA • NCSA • PNG (Pacific Northwest Gigapop) • Starlight (located at Univ. Illinois, Chicago) • Transpac (located at Indiana Univ.) • UCSD • SDSC

  12. APGridPMA: Status & Activities • Accreditation of CAs • 9 accredited CAs • AIST, APAC, ASGCC, CNIC, IHEP, KEK, KISTI, NAREGI, NCHC • 7 CAs are in operation • CNIC/SDG will change the structure and will be re-accredited • Audit • AIST, APAC, ASGCC, IHEP have been audited by the other CAs. • Regular (monthly) VTC. • Brief status reports of each CA • In-depth report of a CA • Decisions • Examination for accreditation of a CA • Approval of charter, minimum CA requirements, etc. • Open discussions • (physical) face-to-face meeting (at least) once per year. • 1st face-to-face meeting was in Dec. 2005, Beijing. • 2nd meeting will be in Oct. 15, 2006, Osaka, Japan.

  13. Some Updates • Issues to be discussed • Accreditation of NGO/Netrust CA • Some information are confidential • Too short validity period of CRL • Netrust CA agreed with disclosing audit report to the APGrid PMA auditors • Accreditation of CNIC/SDG CA • hierarchical CA • IGTF CA distribution from the APGrid PMA • Will need to limit the number of CAs per region • Japanese universities will build UPKI • China has some national/international Grid project • Need to consider hierarchical structure of PMAs

  14. Proposed audit items • NAREGI PKI WG has subjectively selected criteria for auditing Grid CAs. • based on • AICPA/CICA WebTrustSM/TM Program for Certification Authority • minimum CA requirements of APGrid PMA and EUGrid PMA • Web Trust • WebTrust is a seal awarded to web sites that consistently adhere to certain business standards established by the Canadian Institute of Chartered Accountants (CICA.ca) and the American Institute of Certified Public Accountants (AICPA). • In the program, “Web Trust Principles and Criteria for Certification Authorities” lists criteria for CAs. • may too much for Grid CAs.

  15. Audit checklist • Simply pickup items from WebTrustSM/TM criteria based on minimum CA requirements. • The number of criteria:

  16. Rough procedures for auditing • Pre examination (few days) • Review all available documents • CP/CPS, User’s manual, Operational manual, CRL, CA Certificate, etc. • Prepare score sheet • Main examination (half day) • Interview to CA staffs • Detailed flow of identifying end entities and issuing certificates • How accesses to the CA private key is controlled • Inspection of equipments • CA server, CA room, backup media, archived logs, a safe box, etc. • Post examination (half day) • Draft and send an audit report • The audited CA is requested to send a report on plans for the improvements in 1 week

More Related