CLIC baseline changes G.Geschonke ACE 2.2.2010 G.Geschonke
General and upgrade E-Scan E-Scan space fix parmeter E-Scan new scheme fix parmeter ACE 2.2.2010 G.Geschonke
Drive Beam generation and distribution cost E-Scan cost fix parameter E-Scan E-Scan beam dyn. resist. wall cost Slide ACE 2.2.2010 G.Geschonke
Single DB complex at 500 GeV 3 TeV 0.5 TeV ACE 2.2.2010 G.Geschonke
Drrive Beam phase control Slide from Daniel Schulte ACE 2.2.2010 G.Geschonke
Main Beam Injector complex significant beam loading funneling? Increase e+ capture efficiency Slide civ. engineering optimisation beam dyn cost beam dyn polarisation civ. engineering ACE 2.2.2010 G.Geschonke
500 GeV to 3 TeV ACE 2.2.2010 G.Geschonke
Main Beam Linac cost reliability of BBF cost cost ACE 2.2.2010 G.Geschonke
Accelerating structure, PETS, Module performance new system new system cost cost cost to be developed cost ACE 2.2.2010 G.Geschonke
Machine detector interface Beam Delivery system slide new development Concept M.Modena new development Slide fix design ACE 2.2.2010 G.Geschonke
L * Slide from D.Schulte S ACE 2.2.2010 G.Geschonke
IP Beam control Slide from D. Schulte ACE 2.2.2010 G.Geschonke
Conclusion • Coherent approach to baseline changes • freeze decisions for CDR end March ACE 2.2.2010 G.Geschonke